本文讨论了在特定条件下为何无法将Opty R状态更新为R2完成的问题。要实现此状态更新,需要满足两个条件:一是机会必须已经生成提案;二是风险路径必须是Express、FastTrack无需审批或已由CD/CL确认审批。当前由于风险路径未确定,导致状态无法更新。

Why the case cannot change to R2 complete even we check the proposal generated flag?

 

As per our webex chat, To make the oppty R status as R2 complete, Opty needs to be proposal generated and Risk path needs to be one among Express,Fast Track with no Approval Required or Approvals Confirmed by CD/CL needs to be True. So currently the Risk path is Undetermined. Due to that opty R status is not updated as R2 complete.