GSOE9820 The project management plan

「文智助手」全场景办公AI助理AI+OPC全流程实践方案(大赛作品) 阅读详情

**School of Minerals and Energy Resources Engineering**

**GSOE9820 Assignment Tasks 1-3**

**Purpose**

The project management plan (PMP) includes all the information required to successfully manage your project to completion. It documents the careful planning work done by the project team before the project enters the execution phase. It is the project team’s description of how they are going to manage the project to achieve its objectives, within its constraints. One way to think about the PMP is to imagine your team is moved to another, higher priority project and your recently completed PMP document is given to the new team. Will they be able to manage your project to completion using your PMP?

In a professional setting, a PMP may vary between enormous, multiple volume guides for example in large infrastructure, or defence procurement projects, to a simple 2-page project brief for a quick internal project in asmall workplace. In any case, creating some variation of a PMP is ubiquitous in industry, and an important piece of experience to take with you from this course.

**Skills**

In this assignment you will show that you can perform. the first four course learning outcomes (CLOs), which are:

1.  Translate organisational objectives to project deliverables

2.   Formulate project scope

3.   Select and apply project management methods

4.   Integrate and justify project plans

Refer to the learning outcomes document for more information on these.

**Knowledge**

This assignment will also help you to become familiar with the following important content in this discipline:

The Project Charter                   Risk mitigation                   Change management

Budgeting                                 Project scope

Stakeholder management           Design Thinking

Scheduling                                Teamwork

Risk management                       Resource management

Project integration                      Communications

Human Resources                       management

The PMBOK Guide                       Procurement

Estimating cost and time              Requirements definition

Contingency planning                  Planning for opportunity

**Task** ******1-** **Scope** ******Definition**

| **Learning outcomes** | **Group/individual** | **Weighting** | **Deadline**     | **Hand-in** |
| --------------------- | -------------------- | ------------- | ---------------- | ----------- |
| CLO-2                 | Individual           | 5% (overall)  | Week 3 Fri 17:00 | Moodle      |

Instructions

Carefully read the project brief that you have chosen to work on. It gives a general description of the  objectives of your project, but it may not say how these are going to be achieved, or what exactly the project will deliver in order to provide a solution.

Consider what your project will need to do to fulfill its objectives and to realise the supposed benefits. What are its major deliverables? What smaller deliverables代 写GSOE9820  The project management plan   constitute these major deliverables? What  other work is going to be necessary to make sure the project is a success, and what are the tangible outcomes of this extra work?

Review the lecture content, especially the week 1 and 2 Scope slides.  Read PMBOK (6th  Ed.) Sec. 4.1.3, Sec. 5.3.3.1 and Sec. 5.4.

1.   Write a statement that defines the purpose of your project in under 30 words.

2.   Draw a work breakdown structure (WBS) diagram that shows the major deliverables of your project and decomposes each of these down to the work package level.

3.   Write a scope statement for your project in under 100 words.

Hand in your WBS diagram and project purpose/scope statements by the deadline.

**Task 2 -** ******PMP** ******Components**

| **Learning outcomes** | **Group/individual** | **Weighting**     | **Deadline**     | **Hand-in** |
| --------------------- | -------------------- | ----------------- | ---------------- | ----------- |
| CLO-1,2,3             | Group                | 40% forsubmission | Week 7 Fri 17:00 | Turnitin    |

Instructions

For Task 2, develop the (PMP) for the same project you described in Task 1, while demonstrating the application of PM Methods.

Structure your PMP according to the PMBOK guide Sec. 4.2.3.1.

Add an introduction section to your PMP that demonstrates a direct link between the project benefits, its major deliverables, stakeholders, and the strategic objectives of the client organisation.

Include baselines and management plans for the **fi** **ve** PM knowledge areas covered by the C3PE methodology shown in week 1, which are the management of Stakeholders, Scope, Risk, Schedule, and Cost.

To further strengthen your plan, include **two** further PMBOK knowledge areas. Communications and  Resources management are covered briefly in the lectures. You can alternatively spend some further time researching other knowledge areas, represented by the PMBOK chapters, on your own or with your group.

To demonstrate your application of the PM knowledge areas, you can include content in your subsidiary management plans that relate to the following categories:

**1.** ******Baselines**

*Results of work done by* ***your team*, to develop the plan. This is the most direct and simplest kind of work to include because it forms your actual baseline project plan. E.g., your project baseline schedule, project risk register and baseline budget would be examples of this.

**2.** ******Methods**

*Descriptions of* ***PM methods us* *ed by* ***your team*, to develop the project plan. E.g., describe how you analysed stakeholders, how you decomposed the WBS, or how you ranked risks and opportunities for your project. While these accounts are not your actual plan, they show how you have applied PM methods, and why you selected them.

**3.** ******Plans**

*Guides to how to manage the project* - for your team, or the PM who executes the project if this is not you to successfully complete the project. E.g., describe how the project team should continue to iterate scope, elicit requirements from stakeholders or continue to develop the project plans. How should they evaluate progress and closeout the deliverables? This category shows what management tasks will need to be continued after the start of project execution and shows that you understand what this work is.

**Task 2 - Wk 6** ******Individual** ******Progress** ******Chec** **k** ******Presentation**

| **Learning outcomes** | **Group/individual** | **Weighting** | **Open**       | **Hand-in**                                           |
| --------------------- | -------------------- | ------------- | -------------- | ----------------------------------------------------- |
| CLO-1,2,3,4           | Individual           | 5%            | Week 6workshop | One minutepresentation   per student in tutorial time |

In the week 6 meeting with demonstrators, student teams are requested to present an overview of all   parts of their PMP project, in which each team member will spend one minute to show and summarise the work that they have completed for the PMP. This activity is provided as an opportunity for students to receive final guidance on how to improve integration between different parts in their PMP assignment.

Crucially, the group presentation also gives demonstrators a clear overview of the contribution of different team members, and this insight becomes apart of the grading of the PMP assignment. For this reason, full participation is strongly recommended for everyone in the team. This will happen during your tutorial session and attendance will be recorded.

**Task 3 -** ******PMP** ******Integration** ******(interview ass** **essed)**

| **Learning outcomes** | **Group/individual** | **Weighting** | **Deadline**     | **Hand-in**          |
| --------------------- | -------------------- | ------------- | ---------------- | -------------------- |
| CLO-4                 | Group                | n/a           | Week 9 Fri 17:00 | Moodleassignment box |

Change

After you hand in Task 2, you will be asked to make a change to your PMP. The requested change may be tailored to your project and so it is not possible to list all possible options for change in advance. By way of example, this change could include, but is not limited to, the following possibilities:

•    Changes in the budget

•    Changes to scope

•    Changes to assumptions and risks

Integration

Review and update your PMP, with a particular focus on implementation of your change request and full integration between the different parts of the plan. You may change the PMP as much as you like. See the references to the PMBOK Guide for the definition of project integration [1]. To quickly get a good understanding of integration, consider that when reading through a PMP displaying excellent integration, you should be able to say ‘yes’ to the following questions:

1.  Have all the work packages (the lowest level of the WBS) been costed? are they all in the schedule? Are they in the budget?

2.  Can the risks be traced to actual WBS and schedule items?

3.  Can you trace the risks to the stakeholders, or to other project items?

4. Are the risk mitigation and contingency strategies comprehensive, properly costed, estimated for scheduling, and included in the budget and schedule?

5.  If you've said you will do something in the resourcing plan, does it appear in the budget and the schedule?

You must hand in your updated PMP before your interview. **The updated** ******PMP** ******change will** ******not** ******be** ******graded as a separate assignment**, but this document will be referred to by the assessor in your interview and you will need to be able to answer questions about its content.

船载 OpenHarmony AIS 航海工作台:告警与防碰撞预警系统 船载OpenHarmony AIS航海工作台的告警与防碰撞系统,集成十余类告警(超速、偏航、会遇、SOS等),通过网格空间索引实现高效邻近判定,保障实时性。告警管理器统一调度规则、去重、通知与日志,支持悬浮球、语音、跑马灯、弹窗多渠道触达,确保航行安全。SOS紧急通道独立运行,避免干扰。系统设计强调性能优化与多场景适配,为航海安全提供核心支撑。 阅读详情

相关推荐

AI 应用开发:四维架构落地实战——以 HR Agent 为例拆解感知·推理·记忆·执行【意图路由、规划编排、长期记忆、工具执行、面试题】

本文基于四维架构(感知·推理·记忆·执行),以HR Agent为例,系统拆解大模型应用从“聊天”到“生产可用”的落地路径。通过Spring AI实现意图路由、规划编排、RAG检索与工具调用,结合真实踩坑复盘,揭示架构化设计对安全、成本与可维护性的关键价值,为AI Agent工程化提供可复用的实战框架。

王大师企业官方博客 1318

AI 问数真的能替代 BI 报表吗?

AI问数赋能自然语言查询,提升临时分析效率,但无法替代传统报表。报表适用于稳定输出与持续监控,AI则擅长探索性提问。企业用好AI问数,关键在于夯实数据模型、统一指标口径、健全权限体系与结果校验机制。合理组合报表、仪表板与AI,才能实现高效、准确的业务洞察。

葡萄城技术团队博客 338

Spec-Kit实战:用‘规范驱动开发’重构一个老旧Node.js项目(避坑指南)

本文详细介绍了如何使用Spec-Kit工具通过‘规范驱动开发’(SDD)重构老旧Node.js项目。从逆向工程提取规范到增量改造策略,再到避免典型陷阱,提供了实战指南和避坑技巧,帮助开发者高效实现架构现代化,显著提升代码质量和维护效率。

weixin_42525582的博客 555

【从零理解 Spring AI · 12】MCP 的两种角色:做客户端还是做服务端

上一篇讲了 MCP 的概念:标准协议、三大角色、M+N 替代 M×N。

nice_lcj520的博客 614

交通流预测爬坑记(一):交通流数据集,原始数据

常用的交通流数据集,持续更新~~

K_first的博客 4万+

Tribon Vitesse开发教程(一)

Tribon Vitesse简介 Tribon Vitesse是Tribon提供给Python编程语言的编程接口,它是一系列的API。使用Python的语法调用这些API,结合Python语言自身的语法生成的程序叫做Vitesse程序。Vitesse是法语“速度”的意思,读作“为戴斯”。使用Tribon Vitesse可以直接访问Tribon产品信息模型和使用Tribon应用程序的功能,以控制设计

forevermemory的专栏 2594

ChatGPT、Perplexity、Gemini 与 AI Overviews 引用对比:谁的引用更可信

AI 引擎的引用机制差异很大:ChatGPT 以行内引用加 Sources 列表呈现来源,Perplexity 几乎逐句可溯源,Gemini 在回答中内嵌相关来源链接,AI Overviews 则把多源聚合答案与来源列表一起放在搜索结果顶部。本文从引用透明度、来源偏好、可干预性 3 个维度对比这 4 个引擎,并给出 GEO 的 3 点启示,帮企业在多引擎环境下提升被引用的概率。

淡然一笑 的专栏 273

Arduino ESP32S3开发环境搭建 ------ 在线下载安装包Failed解决方案

本文介绍了Arduino ESP32 S3开发环境搭建的离线解决方案。

张一西的博客 1019

抽象主义人工智能和生命体AI的内在联系

彭军辉提出“抽象主义人工智能”作为第四大AI范式,批判符号主义、连接主义、行为主义剥离生命本体的误区,确立“智能是现象,生命是本体”的核心公理。主张原生智能必须依附具备存续诉求的生命本体,提出“生命体AI理论”,构建七层演化阶梯与自闭环工程框架,强调智能不可跳过底层存续机制直接模拟语言。该体系为生成式AI提供科学边界,推动从“仿真表象”向“原生智能”的范式跃迁,开辟硅基人工生命新赛道。

抽象主义人工智能和生命体AI 206

别再只会复制Haar级联代码了!OpenCV人脸检测全方案深度解析,从原理到工业级落地

通用预训练模型在你的业务场景效果不好时,用自己的业务数据集训练专属的级联器,是提升精度的终极方案,OpenCV自带和工具,支持自定义Haar/LBP级联器训练。场景首选方案次选方案新手入门学习Haar级联分类器LBP级联分类器嵌入式轻量固定场景LBP级联分类器YuNet轻量版工业级落地项目(99%场景)DNN+YuNetMTCNN多人脸+小目标复杂场景DNN+YuNet自定义微调模型同时做人脸+其他目标检测。

2601_94871597的博客 381

基于 Simulink 的 PFC + LLC 级联系统联合仿真与优化实战教程

摘要:本教程详细介绍了2kW级AC-DC变换器建模方法,采用"BoostPFC+LLC谐振变换器"组合架构。重点解析了双级系统的核心控制策略:前级BoostPFC实现功率因数校正(PF>0.95),后级LLC通过变频调制(PFM)实现高效能量传输。教程包含四大关键步骤:PFC建模与控制、LLC参数计算与实现、母线电容优化设计以及系统联合调试,特别针对级联系统常见的母线电容震荡问题提供了解决方案。同时给出了仿真波形分析指南和避坑建议,包括代数环处理、仿真步长设置等实用技巧,为新能源车

MHD0815的博客 121

OpenAI Control Room 架构拆解:给企业 AI Agent 加一套可审计的急停系统

OpenAI 公开了用于追踪和停止研究模型工作负载的 Control Room。本文拆解 job_id、推理前鉴权、35 秒撤销窗口与 Fail Closed 设计,并给出企业 AI Agent 急停控制面的数据模型、FastAPI 参考实现、缓存撤销策略和故障演练清单。

jerry764的博客 340

131、高通骁龙影像平台总览:Spectra ISP 各代架构演进与特性对比

摘要:本文深入分析了高通骁龙Spectra ISP从250到780代的架构演进与技术痛点,揭示了各代关键改进与隐藏问题。重点剖析了双ISP带宽分配、AI ISP黑盒决策、温度控制等实战问题,并给出具体解决方案(如寄存器配置、QoS调整等)。文章强调工程师需平衡带宽、功耗与画质的三角关系,建议调试时先关闭AI模块建立基线,关注统计引擎配置,并建立温度监控机制。最后指出理解架构局限比追求完美设计更重要,需要针对不同场景找到合适的妥协方案。(148字)

sundong_81的博客 208

OpenClaw 深度调查:把 AI 助手做成你自己的控制平面

对 openclaw/openclaw 的完整技术尽调:Gateway 架构、Agent 运行时、工具与沙箱、30 个消息通道、181 个插件、安全信任边界、工程代价与采用建议。17 章 / 10 张图,全部数字标注口径,数据截至 2026-10-31。

厚积薄发 349

UDF学习(四)FLUENT UDF-DEFINE_PROFILE宏

利用DEFINE_PROFLILE可以指定以下边界或计算域信息:DEFINE_PROFILE(name,t,i)//既可以用。

weixin_44386973的博客 1807

老版QQ原生表情gif动态

这是老版的QQ表情,不过全是动态的的,Windows照片查看器是不会动的,可以右击用浏览器打开查看,再说一遍是老版的,只是分享给宁愿用老版也要动态的人。

AI赋能智慧港口建设|造形家快速生成港口全要素三维场景

随着智慧港口、港口数字孪生项目的持续推进,港口三维场景的需求日益旺盛。传统港口三维建模,往往需要航拍倾斜摄影采集数据,再人工搭建吊机、岸桥、船舶、集装箱等大量工业设施模型,项目周期长、人力成本高,修改迭代繁琐,制约港口可视化项目落地效率。国产AI三维建模工具,依托卫星影像 AI 识别能力,无需航拍作业,一键快速搭建港口完整三维场景,为港口数字孪生、方案汇报、投标演示提供高效的场景解决方案。

m0_69539167的博客 84

大中型超市收银系统(可直接运行)

光步前台收银系统系统功能:商品销售、商品退货、挂单、收银员权限、会员销售、单品取消、整单取消、商品查询、脱机销售、脱机数据上传,基本资料下载,开钱箱、小票打印、收款结算,支持多币种付款方式(现金、储值卡、礼券、微信等),支持多种促销。运行环境:.net 4.0登陆信息用户名:1001 密码:123456内置商品信息,商品编码可输入00001000 - 00010000,测试效果相关功能键F5 结算 F9挂单 F11商品查询 F8退货 Insert单品取消 Del整单取消 F12开钱箱F2 会员 Ctrl+Z退出系统 Home 锁屏 相关源码待公开

从设备增点到治理闭环:老旧小区物业数智化落地实践

系统连接合同审批、银行流水、收费记录与项目台账,执行到期提醒、收入核验、异常标色和月度对账,让每一笔资金来源明确、去向可查。针对设施老旧、诉求响应慢、公共收益不透明等问题,津南以6类小区为试点场景,统一建设物业数字化底座,关联楼栋、单元、房屋、业主、空间、设施设备、工单、公共收益等核心数据。系统采用统一编码管理,将摄像头、路灯、井盖、道路、绿化等设施纳入资产台账,解决纸质记录更新滞后、故障责任难追溯的问题。基于历史工单建立分类模型和知识库,辅助识别照明、给排水、电梯、环境秩序、秩序维护等问题;

wuyeshuzhihua的博客 157

精雕软件(JDpaint) 5.5 绿色版

精雕软件(JDpaint) 5.5 绿色版精雕软件(JDpaint) 5.5 绿色版精雕软件(JDpaint) 5.5 绿色版

Probability and Statistics - 4th edition

Probability and Statistics - 4th edition

企业微信iPad协议详解:接口接入、实时消息同步与语音转码实践

深入解析企业微信iPad协议的技术架构与开发思路,涵盖API接口接入、长连接通信、实时消息同步、Silk语音转码、异常重连及高并发优化,帮助开发者了解企业微信自动化系统的设计与实现。

欢迎来到祖安! 511

Product Hunt 热榜 2026-11-13:Plurai Simulation、YouArt Desktop App、Omnigraph

2026-11-13 Product Hunt 新产品精选:Plurai Simulation、YouArt Desktop App、Omnigraph。汇总 15 款产品的中文介绍、功能关键词和产品链接。

LaughingZhu的博客 614

【AI Agent面试系列】AI Agent可观测、评测、安全相关的知识点

之前的文章介绍了和,本文主要介绍AI Agent的测评、可观测等知识。

405

Docling 原理解读:是什么、为什么、怎么样

从论文视角拆解 Docling 的整体架构、DoclingDocument 数据模型、PDF 预处理、版面分析、OCR、TableFormer 双解码器、阅读顺序与装配流程,并解释版面框与 OCR 框的区别。

PLANTTHESON的博客 401

WorkBuddy 实战:一句话需求 → 七屏可交互原型,户外徒步 App 的 AI 设计全流程

WorkBuddy 实战:一句话需求 → 七屏可交互原型,户外徒步 App 的 AI 设计全流程,跟着博主一起来还原整个过程。

夜郎King的博客 5156

从认识人工智能到理解机器学习:我的 AI 入门第一课

正式开始学习人工智能之前,我对 AI 的认识其实比较模糊:知道 ChatGPT、知道大模型,也知道现在很多岗位都在谈 AI,但如果有人问我“人工智能到底是什么”“机器是怎么学会识别一只猫的”,我未必能从头到尾讲清楚。上午的课程更偏向行业全景:人工智能的发展、研究方向、NLP、岗位分工、学习路线和 AI Coding 工具。下午的课程更偏向技术基础:机器学习的原理、有监督学习、深度学习、模型训练和评估方法。

chh563的博客 564

企业宣传片发前如何批量排查并遮挡视频里的敏感信息

做企业视频的人都会碰到一个具体问题:实拍画面里混进了不该出现的信息。办公室背景里有贴着客户信息的白板,采访对象的授权书边缘露出一串身份证号码,街采素材里路人面孔和车牌号直接入镜。人眼在时间线上扫视,会漏掉快速闪过的帧、画面边缘的小字、以及暗光区域里的证件号码。用抹影AI完成车牌、人脸和证件区域批量检测后,又手动补充了两个时间段的屏幕遮罩,最终导出时画面已无合规隐患。重点关注快速运动、遮挡、低光照条件下的目标,这些是漏检的高发区域。导入视频后选择要检测的目标类型(人脸、车牌、证件号、二维码等)。

Mysssone的博客 181

面向工业对讲的双通道声学 DSP 模组 A-59(NR2050-A)方案解析与工程落地案例

A-59模组以NR2050-A DSP为核心,37.5×16mm邮票孔封装,支持-40℃~85℃工业温域,兼容A-06/A-09/A-29系列,可低成本替换存量设备。通过固件切换实现三种模式:模式一(低改版成本,适配矿井、电梯);模式二(最优AEC,用于医院呼叫);模式三(双波束独立输出,支持双人会议语音分离)。集成AEC、ENC、BF与AGC算法,有效抑制回声、噪声与串扰,解决对讲系统核心声学难题。选型需注意参考信号路径、麦间距与温度匹配,建议先做声学测试再量产。

R190_6589的博客 371

SAP商业AI正式通过网信备案:企业落地AI五问

中数通“CDC商业AI”通过广东网信部门备案,标志着SAP商业AI在华本地化迈出关键一步。然而,合规仅是起点,企业真正需关注的是:AI能否融入核心流程、数据治理是否健全、责任归属是否清晰、价值衡量机制是否建立。从“可用”到“用好”,关键在于工作流重构、跨团队协同与业务结果导向的评估体系。国产模型成本优势与本地部署能力为ERP深度集成提供可能,但真正的竞争力仍在于对数据、流程与业务上下文的理解力。

Acloudear的博客 214
上一篇: ISE529 Predictive Analytics
下一篇: CSSE2310 Command Line Arguments
vx___codinghelp
博客等级 码龄2年 778粉丝 101原创
评论
成就一亿技术人!
拼手气红包6.0元
还能输入1000个字符
 
 条评论被折叠 查看
添加红包

请填写红包祝福语或标题

个

红包个数最小为10个

元

红包金额最低5元

当前余额3.43元 前往充值 >
需支付:10.00元
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付元
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值