1、This question is about software development activities. Please name the four major activities in software development?

requirement analysis

software design

Program coding

software test/Software testing and maintenance

 

2、This question is about the waterfall model and the agile model of software development.

  1. a)What is the waterfall model?

  2. Waterfall model defines the activities of software life cycle as several stages of work connected in a fixed order, such as waterfall flow, and finally software products can be obtained.

  3. b)What is the agile model?

  4. Agile software development is an approach to software development under which requirements and solutions evolve through the collaborative effort of self-organizing and cross-functional teams and their customer(s)/end user(s).

  5. c)Briefly describe 2 advantages and 2 disadvantages of the waterfall model.

  6. advantages:

  7. 1) Provide checkpoints by stages for the project.
    2) After the current stage is completed, you only need to focus on the subsequent stage.
    3) The waterfall model can be applied in the iteration model.
    Incremental iteration is applied to the waterfall model. Iteration 1 solves the biggest problem. Each iteration produces a runnable version with additional functionality. Each iteration must undergo quality and integration testing.
    4) It provides a template that enables methods of analysis, design, coding, testing and support to have a common guidance under the template.

  8. disadvantages:

  9. 1) The division of each stage is completely fixed, and a large number of documents are generated between stages, which greatly increases the workload.
    2) Because the development model is linear, users can not see the development results until the end of the whole process, which increases the development risk.
    3) Tracking project phases through excessive mandatory completion dates and milestones.
    4) The prominent disadvantage of waterfall model is that it can not adapt to the changes of users'needs.

  10.  

  11. d)Briefly describe 2 advantages and 2 disadvantages of the agile model.

  12. advantages:

  13. Agile methodologies perform relatively small functions in a few weeks or months, emphasizing the ability to deliver the smallest available functions as early as possible and to continuously improve and enhance them throughout the project cycle.

  14. disadvantages:1)With the growth of scale, face-to-face communication becomes more and more difficult.

  15. 2)A large number of assumptions or rapid gathering of requirements at the beginning of a project may lead to a misunderstanding of the project, especially when customers have no idea of their own needs.

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值