Cross-plant material status in Material Master (Basic data 1)

本文详细介绍了如何通过移除X-Plant材料状态中的封锁键(如Block for procurement 和 Block for purchasing),来解决材料无法创建采购订单和采购请求的问题。包括路径查找、关键字段设置及常见材料状态解释。

1.

Is Blocking Key assigned to material master in basic data 1 view in  X plant material status, if yes, remove blocking key and create PR & PO. Or check  source list(ME01) is  material blocked for procurement, if yes, remove it and save .Now  go for creation of PR & PO of material.

 

The blocking keys(01-Block for procurement" and "BP-Block for purchasing), as you have, the

code and description may be different but  properties are same and both are cause for same purpose which is not allowing you to creates PR & PO as procurement and purchasing both looks very much similar word as designed by your consultant!

 

 

You can find out both keys ( 01 and BP) details in following path , where Purchasing segment set  B in field of. Purchasing msg. 

 

SPRO > Logistics -General > Material Master > Settings for Key Fields > Define Material Statuses

 

 

Now as needed/required by you remove the Blocking Key 01 or BP  and try to create PR & PO! So you are able to create PR & PO

 

X-Plant status - Meaning of that number

01 - Obsolete

03 - Hibernate/standby

05 - Discontinue

10 - Concept

11 - Pending production

15 - Engineering model

20 - prototype

30 - o-series

40 - serial production

45 - project production

50 - specila production

55 - phase out

转载于:https://www.cnblogs.com/jefflu2012/p/4126592.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值