Zhuhai China trip 21 Nov to 24 Nov through HK-Zhuhai-Macau Bridge

Summary

I went to Zhuhai China from 21st Nov to 24th Nov’18, the most convenient route was going through Hong Kong, and taking bus through Hong Kong Zhuhai Macau bridge, as you could take bus any time. You will have follow the fixed schedule to take boat between Hong Kong and Zhuhai.

Hotel at Zhuhai, Pullman.
Pullman hotel

Through hotel window,
Hotel window

Itinerary

WED 21NOV SINGAPORE CHANGI TERMINAL 4 0650 CX 650 HONG KONG INTL
TERMINAL 1

SAT 24NOV HONG KONG INTL TERMINAL 1 1135 CX 739 SINGAPORE CHANGI
TERMINAL 4

At Singapore Changi airport before boarding CX650 to Hong Kong.

Singapore T4

Singapore Terminal 4

At Hong Kong airport going back to Singapore,

Hong Kong airport

At Hong Kong airport before check in CX739 to Singapore.

Hongkong airport

Hong Kong to Zhuhai

Arrived Hong Kong from Singapore on 21st Nov,

Arrived HK

Need to take bus B4 from Hong Kong airport to HZM bridge Hong Kong port,

B4

Direction to bus stop to take bus number B4,

B4

At bust stop to take B4,

B4 Bus stop

On the B4 double deck bus,

B4

Arriving HZM bridge Hong Kong port, took 10 minutest from Airport to the port,

HZM bridge HK port

After bought ticket, 65 Hong Kong dollar, heading to the entrance to take the bus,

Zhuhai

Boarded the bus,

On the bus

Heading to Zhuhai,

Heading to Zhuhai

On the Hong Kong Zhuhai Macau bridge,

HZM Bridge

Private car on the HZM bridge, two car plates,

Private car

Heading to Zhuhai,

Hong Kong Zhuhai Macau bridge

On the bus,

On the bus

Arrived Zhuhai port,

Zhuhai port

Zhuhai to Hong Kong

At Zhuhai port to take bus to Hong Kong on Saturday 24th Nov.

Zhuhai

Took taxi from Hotel to HZM bridge Zhuhai port,

HZM bridge Zhuhai port

It was crowded on Saturday 24th Nov, people without pre-booked ticket cannot enter. I didn’t book the ticket in advance, but I was going to Hong Kong airport to take air flight, no such entrance issue, Hong Kong was limiting the number mainland people to enter to Hong Kong through the HZM bridge.

Crowds

Self service machine to buy ticket,

buy ticket

Bus ticket to Hong Kong, CNY 58.

Bust ticket

HZM bus,

HZM bus

Before boarding bus to Hong Kong,

bus

On the bus to Hong Kong,

On the bus

On the bust to Hong Kong,

bus

Arriving Hong Kong port,

Arriving HK

After arrived Hong Kong port, went through the immigration checking, then took B4 bus again to go to Hong Kong airport, around 15 minutes to arrive Hong Kong airport,

B4

Fu Hua Li (富华里)

Fu Hua Li commercial street,

Fu Hua Li

Visiting customer,

Fu Hua Li

Cartoon portraits at Fu Hua Li

Spent 70 RMB to get a cartoon portrait, 30 RMB for black and white, 30 RMB to put on color, and 10 RMB for lamination.

歪叔叔
歪叔叔

Cartoon

Cartoon

Reference

港珠澳大橋澳門來往香港機場經驗
亲测 | 从港珠澳大桥前往香港机场交通攻略

标题基于SpringBoot+Vue的社区便民服务平台研究AI更换标题第1章引言介绍社区便民服务平台的研究背景、意义,以及基于SpringBoot+Vue技术的研究现状和创新点。1.1研究背景与意义分析社区便民服务的重要性,以及SpringBoot+Vue技术在平台建设中的优势。1.2国内外研究现状概述国内外在社区便民服务平台方面的发展现状。1.3研究方法与创新点阐述本文采用的研究方法和在SpringBoot+Vue技术应用上的创新之处。第2章相关理论介绍SpringBoot和Vue的相关理论基础,以及它们在社区便民服务平台中的应用。2.1SpringBoot技术概述解释SpringBoot的基本概念、特点及其在便民服务平台中的应用价值。2.2Vue技术概述阐述Vue的核心思想、技术特性及其在前端界面开发中的优势。2.3SpringBoot与Vue的整合应用探讨SpringBoot与Vue如何有效整合,以提升社区便民服务平台的性能。第3章平台需求分析与设计分析社区便民服务平台的需求,并基于SpringBoot+Vue技术进行平台设计。3.1需求分析明确平台需满足的功能需求和性能需求。3.2架构设计设计平台的整体架构,包括前后端分离、模块化设计等思想。3.3数据库设计根据平台需求设计合理的数据库结构,包括数据表、字段等。第4章平台实现与关键技术详细阐述基于SpringBoot+Vue的社区便民服务平台的实现过程及关键技术。4.1后端服务实现使用SpringBoot实现后端服务,包括用户管理、服务管理等核心功能。4.2前端界面实现采用Vue技术实现前端界面,提供友好的用户交互体验。4.3前后端交互技术探讨前后端数据交互的方式,如RESTful API、WebSocket等。第5章平台测试与优化对实现的社区便民服务平台进行全面测试,并针对问题进行优化。5.1测试环境与工具介绍测试
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值