What is Change Number

本文介绍变更管理中变更号的作用,包括唯一标识变更记录、控制与记录所有变更活动等。变更号可通过工程变更管理(ECM)系统分配,适用于物料主数据、任务清单、物料清单等多种场景。通过ECM系统,不仅保存变更前后的数据状态,还能支持未来日期生效的变更。

摘要生成于 C知道 ,由 DeepSeek-R1 满血版支持, 前往体验 >

Number used to uniquely identify a change master record.

All changes made with reference to a change number are controlled and logged by the change master record.

Numbers can be assigned both internally and externally.

Change Nos through Engineering Change Management (ECM) could be used for logging changes in Material Master, task lists , BOMs & documents etc. Its not mandatory that the changes should be through ECM only but in case your business scenarion requires complex data changes which you need to document then ECM is a must. Through ECM changed object's data is saved twice - its state before the change and state after the change . So you have complete history. Also in case you want some change to be effective from some future date , ECM would take care of that.

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值