附录B CMMI特定目标(SG)和特定实践(SP)汇总
CMMI 2级过程域:需求管理(REQM) | ||
SG1 |
Manage Requirements 管理需求 | |
|
SP 1.1 |
Obtain an Understanding of Requirements 获得对需求的理解 |
|
SP 1.2 |
Obtain Commitment to Requirements 获得对需求的承诺 |
|
SP 1.3 |
Manage Requirements Changes 管理需求的变更 |
|
SP 1.4 |
Maintain Bidirectional Traceability of Requirements 维护需求的双向可追溯性 |
|
SP 1.5 |
Identify Inconsistencies Between Project Work and Requirements 识别项目工作与需求的不一致之处 |
CMMI 2级过程域:项目规划(PP) | ||
SG1 |
Establish Estimates 项目估算 | |
|
SP 1.1 |
Estimate the Scope of the Project 估算项目的范围 |
|
SP 1.2 |
Establish Estimates of Work Product and Task Attributes 估算项目属性 |
|
SP 1.3 |
Define Project Lifecycle 定义项目生存周期阶段 |
|
SP 1.4 |
Determine Estimates of Effort and Cost 估算工作量和成本 |
SG2 |
Develop a Project Plan 制定项目计划 | |
|
SP 2.1 |
Establish the Budget and Schedule 编制预算和进度 |
|
SP 2.2 |
Identify Project Risks识别项目风险 |
|
SP 2.3 |
Plan for Data Management 项目数据的管理计划 |
|
SP 2.4 |
Plan for Project Resources 规划项目资源 |
|
SP 2.5 |
Plan for Needed Knowledge and Skills 知识和技能的计划 |
|
SP 2.6 |
Plan Stakeholder Involvement “项目干系人”的介入计划 |
|
SP 2.7 |
Establish the Project Plan 制定项目计划 |
SG3 |
Obtain Commitment to the Plan 获得对计划的承诺 | |
|
SP 3.1 |
Review Plans That Affect the Project 审查从属计划 |
|
SP 3.2 |
Reconcile Work and Resource Levels协调工作与资源配置 |
|
SP 3.3 | |
CMMI 2级过程域:项目监控(PMC) | ||
SG1 |
Monitor Project Against Plan 依据计划监督项目 | |
|
SP 1.1 |
Monitor Project Planning Parameters 监督项目计划的参数 |
|
SP 1.2 |
Monitor Commitments 监督承诺 |
|
SP 1.3 |
Monitor Project Risks 监督项目风险 |
|
SP 1.4 |
Monitor Data Management 监督数据管理 |
|
SP 1.5 |
Monitor Stakeholder Involvement 监督干系人的介入 |
|
SP 1.6 |
Conduct Progress Reviews 项目进展审查 |
|
SP 1.7 |
Conduct Milestone Reviews 里程碑审查 |
SG2 |
Manage Corrective Action to Closure 管理纠正措施 | |
|
SP 2.1 |
Analyze Issues 分析问题 |
|
SP 2.2 |
Take Corrective Action 采取纠正措施 |
|
SP 2.3 |
Manage Corrective Action 管理纠正措施 |
CMMI 2级过程域: 供应商协议管理(SAM) | ||
SG1 |
Establish Supplier Agreements 签定供应商协议 | |
|
SP 1.1 |
Determine Acquisition Type 确定采购方式 |
|
SP 1.2 |
Select Suppliers 选择供应商 |
|
SP 1.3 |
Establish Supplier Agreements 签定供应商协议 |
SG2 |
Satisfy Supplier Agreements 满足供应商协议 | |
|
SP 2.1 |
Execute the Supplier Agreement 执行供应商协议 |
|
SP 2.2 |
Monitor Selected Supplier Processes 监督选定的供应过程 |
|
SP 2.3 |
Evaluate Selected Supplier Work Products 评价供应商产品 |
|
SP 2.4 |
Accept the Acquired Product 验收采购的产品 |
|
SP 2.5 |
Transition Products 移交产品 |
CMMI 2级过程域: 度量分析(MA) | ||
SG1 |
Align Measurement and Analysis Activities 协调度量和分析活动 | |
|
SP 1.1 |
Establish Measurement Objectives 确定度量目标 |
|
SP 1.2 |
Specify Measures 细化度量 |
|
SP 1.3 |
Specify Data Collection and Storage Procedures 确定数据收集和存储规程 |
|
SP 1.4 |
Specify Analysis Procedures 确定分析规程 |
SG2 |
Provide Measurement Results 提供度量结果 | |
|
SP 2.1 |
Collect Measurement Data 收集度量数据 |
|
SP 2.2 |
Analyze Measurement Data 分析度量数据 |
|
SP 2.3 |
Store Data and Results 存储数据和度量结果 |
|
SP 2.4 |
Communicate Results 通报度量结果 |
CMMI 2级过程域: 过程和产品质量保证(PPQA) | ||
SG1 |
Objectively Evaluate Processes and Work Products 客观地评价过程和工作成果 | |
|
SP 1.1 |
Objectively Evaluate Processes 客观地评价过程 |
|
SP 1.2 |
Objectively Evaluate Work Products and Services 客观地评价工作成果和服务 |
SG2 |
Provide Objective Insight 提供客观的洞察 | |
|
SP 2.1 |
Communicate and Ensure Resolution of Noncompliance Issues 通报不符合项,并确保得到解决 |
|
SP 2.2 |
Establish Records 建立记录 |
CMMI 2级过程域: 配置管理(CM) | ||
SG1 |
Establish Baselines 建立基线 | |
|
SP 1.1 |
Identify Configuration Items 识别配置项 |
|
SP 1.2 |
Establish a Configuration Management System 建立配置管理系统 |
|
SP 1.3 |
Create or Release Baselines 创建或发布基线 |
SG2 |
Track and Control Changes 跟踪并控制变更 | |
|
SP 2.1 |
Track Change Requests 跟踪变更请求 |
|
SP 2.2 |
Control Configuration Items 控制变更 |
SG3 |
Establish Integrity 建立完整性 | |
|
SP 3.1 |
Establish Configuration Management Records 建立配置管理记录 |
|
SP 3.2 |
Perform Configuration Audits 执行配置审计 |
CMMI 3级过程域: 需求开发(RD) | ||
SG1 |
Develop Customer Requirements 开发客户需求 | |
|
SP 1.1 |
Elicit Needs 获取客户的需要 |
|
SP 1.2 |
Develop the Customer Requirements 生成客户需求 |
SG2 |
Develop Product Requirements 开发产品需求 | |
|
SP 2.1 |
Establish Product and Product Component Requirements 建立产品需求和构件需求 |
|
SP 2.2 |
Allocate Product Component Requirements 分配产品构件需求 |
|
SP 2.3 |
Identify Interface Requirements 确定接口需求 |
SG3 |
Analyze and Validate Requirements 分析和确认需求 | |
|
SP 3.1 |
Establish Operational Concepts and Scenarios 建立操作概念和场景 |
|
SP 3.2 |
Establish a Definition of Required Functionality 定义功能需求 |
|
SP 3.3 |
Analyze Requirements 分析需求 |
|
SP 3.4 |
Analyze Requirements to Achieve Balance 平衡需求 |
|
SP 3.5 |
Validate Requirements 确认需求 |
CMMI 3级过程域: 技术方案(TS) | ||
SG1 |
Select Product Component Solutions 选择产品构件方案 | |
|
SP 1.1 |
Develop Alternative Solutions and Selection Criteria 开发候选方案和选择准则 |
|
SP 1.2 |
Select Product Component Solutions 选择产品构件方案 |
SG2 |
Develop the Design 设计 | |
|
SP 2.1 |
Design the Product or Product Component 设计产品或构件 |
|
SP 2.2 |
Establish a Technical Data Package 建立技术数据包 |
|
SP 2.3 |
Design Interfaces Using Criteria 设计接口 |
|
SP 2.4 |
Perform Make, Buy, or Reuse Analyses 分析“制作、购买或重用” |
SG3 |
Implement the Product Design 实现产品设计 | |
|
SP 3.1 |
Implement the Design 实现构件的设计 |
|
SP 3.2 |
Develop Product Support Documentation 编写产品支持文档 |
CMMI 3级过程域: 产品集成(PI) | ||
SG1 |
Prepare for Product Integration 准备产品集成 | |
|
SP 1.1 |
Determine Integration Sequence 确定集成次序 |
|
SP 1.2 |
Establish the Product Integration Environment 建立产品集成环境 |
|
SP 1.3 |
Establish Product Integration Procedures and Criteria 建立产品集成规程和准则 |
SG2 |
Ensure Interface Compatibility 确保接口兼容 | |
|
SP 2.1 |
Review Interface Descriptions for Completeness 审查接口描述的完备性 |
|
SP 2.2 |
Manage Interfaces 管理接口 |
SG3 |
Assemble Product Components and Deliver the Product 组装产品构件和交付产品 | |
|
SP 3.1 |
Confirm Readiness of Product Components for Integration确认产品集成已准备就绪 |
|
SP 3.2 |
Assemble Product Components 组装产品构件 |
|
SP 3.3 |
Evaluate Assembled Product Components 核查组装的产品构件 |
|
SP 3.4 |
Package and Deliver the Product or Product Component 打包并交付产品或构件 |
CMMI 3级过程域: 验证(VER) | ||
SG1 |
Prepare for Verification 准备验证 | |
|
SP 1.1 |
Select Work Products for Verification 选择待验证的工作成果 |
|
SP 1.2 |
Establish the Verification Environment 建立验证环境 |
|
SP 1.3 |
Establish Verification Procedures and Criteria 建立验证规程和准则 |
SG2 |
Perform Peer Reviews 执行同行评审 | |
|
SP 2.1 |
Prepare for Peer Reviews 准备同行评审 |
|
SP 2.2 |
Conduct Peer Reviews 执行同行评审 |
|
SP 2.3 |
Analyze Peer Review Data 分析同行评审数据 |
SG3 |
Verify Selected Work Products 验证选定的工作成果 | |
|
SP 3.1 |
Perform Verification 执行验证 |
|
SP 3.2 |
Analyze Verification Results 分析验证结果 |
CMMI 3级过程域: 确认(VAL) | ||
SG1 |
Prepare for Validation 准备确认 | |
|
SP 1.1 |
Select Products for Validation 选择待确认的产品 |
|
SP 1.2 |
Establish the Validation Environment 建立确认环境 |
|
SP 1.3 |
Establish Validation Procedures and Criteria 建立确认规程和准则 |
SG2 |
Validate Product or Product Components 确认产品或构件 | |
|
SP 2.1 |
Perform Validation 执行确认 |
|
SP 2.2 |
Analyze Validation Results 分析确认结果 |
CMMI 3级过程域: 组织过程焦点(OPF) | ||
SG1 |
Determine Process Improvement Opportunities 确定过程改进机会 | |
|
SP 1.1 |
Establish Organizational Process Needs 建立组织过程的需要 |
|
SP 1.2 |
Appraise the Organization’s Processes 评估组织过程 |
|
SP 1.3 |
Identify the Organization's Process Improvements 识别组织的过程改进机会 |
SG2 |
Plan and Implement Process Improvements 规划和实施过程改进 | |
|
SP 2.1 |
Establish Process Action Plans 制定过程行动计划 |
|
SP 2.2 |
Implement Process Action Plans 实施过程行动计划 |
SG3 |
Deploy Organizational Process Assets and Incorporate Lessons Learned 部署组织过程财富 | |
|
SP 3.1 |
Deploy Organizational Process Assets 部署组织过程财富 |
|
SP 3.2 |
Deploy Standard Processes 部署标准过程 |
|
SP 3.3 |
Monitor Implementation 监督实施 |
|
SP 3.4 |
Incorporate Process-Related Experiences into the Organizational Process Assets |
CMMI 3级过程域: 组织过程定义(OPD) | ||
SG1 |
Establish Organizational Process Assets 创建组织过程财富 | |
|
SP 1.1 |
Establish Standard Processes 建立标准过程 |
|
SP 1.2 |
Establish Lifecycle Model Descriptions 建立生存周期模型描述 |
|
SP 1.3 |
Establish Tailoring Criteria and Guidelines 建立裁剪准则和指南 |
|
SP 1.4 |
Establish the Organization’s Measurement Repository 建立组织度量库 |
|
SP 1.5 |
Establish the Organization’s Process Asset Library 建立组织过程财富库 |
|
SP 1.6 |
Establish Work Environment Standards 建立工作环境标准 |
CMMI 3级过程域: 组织培训(OT) | ||
SG1 |
Establish an Organizational Training Capability 建立组织级培训能力 | |
|
SP 1.1 |
Establish the Strategic Training Needs 确定战略培训需求 |
|
SP 1.2 |
Determine Which Training Needs Are the Responsibility of the Organization 确定由组织负责的培训需求 |
|
SP 1.3 |
Establish an Organizational Training Tactical Plan 建立组织培训计划 |
|
SP 1.4 |
Establish Training Capability 建立培训能力 |
SG2 |
Provide Necessary Training 提供必要的培训 | |
|
SP 2.1 |
Deliver Training 交付培训 |
|
SP 2.2 |
Establish Training Records 建立培训记录 |
|
SP 2.3 |
Assess Training Effectiveness评价培训效果 |
CMMI 3级过程域: 集成化项目管理(IPM) | ||
SG1 |
Use the Project’s Defined Process 应用项目定义过程 | |
|
SP 1.1 |
Establish the Project’s Defined Process 建立项目定义过程 |
|
SP 1.2 |
Use Organizational Process Assets for Planning Project Activities |
|
SP 1.3 |
Establish the Project's Work Environment 建立项目工作环境 |
|
SP 1.4 |
Integrate Plans 集成计划 |
|
SP 1.5 |
Manage the Project Using the Integrated Plans 利用集成计划管理项目 |
|
SP 1.6 |
Contribute to the Organizational Process Assets 充实组织过程财富 |
SG2 |
Coordinate and Collaborate with Relevant Stakeholders 与相关干系人协调和合作 | |
|
SP 2.1 |
Manage Stakeholder Involvement 管理干系人的介入 |
|
SP 2.2 |
Manage Dependencies 管理依存关系 |
|
SP 2.3 |
Resolve Coordination Issues 解决协调问题 |
CMMI 3级过程域: 风险管理(RSKM) | ||
SG1 |
Prepare for Risk Management 风险管理准备 | |
|
SP 1.1 |
Determine Risk Sources and Categories 确定风险来源和类别 |
|
SP 1.2 |
Define Risk Parameters 定义风险参数 |
|
SP 1.3 |
Establish a Risk Management Strategy 建立风险管理策略 |
SG2 |
Identify and Analyze Risks 识别和分析风险 | |
|
SP 2.1 |
Identify Risks 识别风险 |
|
SP 2.2 |
Evaluate, Categorize, and Prioritize Risks 风险评估、分类和确定优先级 |
SG3 |
Mitigate Risks 缓解风险 | |
|
SP 3.1 |
Develop Risk Mitigation Plans 制定风险缓解计划 |
|
SP 3.2 |
Implement Risk Mitigation Plans 实施风险缓解计划 |
CMMI 3级过程域: 决策分析与解决方案(DAR) | ||
SG1 |
Evaluate Alternatives 评价候选方案 | |
|
SP 1.1 |
Establish Guidelines for Decision Analysis 建立决策分析指导原则 |
|
SP 1.2 |
Establish Evaluation Criteria 建立评价准则 |
|
SP 1.3 |
Identify Alternative Solutions 确定候选解决方案 |
|
SP 1.4 |
Select Evaluation Methodsc 选择评价方法 |
|
SP 1.5 |
Evaluate Alternatives 评价候选方案 |
|
SP 1.6 |
Select Solutions 选择解决方案 |
CMMI 4级过程域: 组织过程绩效(OPP) | ||
SG1 |
Establish Performance Baselines and Models 建立性能基线和模型 | |
|
SP 1.1 |
Select Processes 选择过程 |
|
SP 1.2 |
Establish Process-Performance Measures 建立过程性能度量 |
|
SP 1.3 |
Establish Quality and Process-Performance Objectives 建立质量和过程性能目标 |
|
SP 1.4 |
Establish Process-Performance Baselines 建立过程性能基线 |
|
SP 1.5 |
Establish Process-Performance Models 建立过程性能模型 |
CMMI 4级过程域: 定量项目管理 | ||
SG1 |
Quantitatively Manage the Project 定量项目管理 | |
|
SP 1.1 |
Establish the Project’s Objectives 建立项目目标 |
|
SP 1.2 |
Compose the Defined Process 组成项目定义过程 |
|
SP 1.3 |
Select the Subprocesses that Will Be Statistically Managed 选择用于定量管理的子过程 |
|
SP 1.4 |
Manage Project Performance 管理项目性能 |
SG2 |
Statistically Manage Subprocess Performance 统计管理子过程性能 | |
|
SP 2.1 |
Select Measures and Analytic Techniques 选择度量和分析技术 |
|
SP 2.2 |
Apply Statistical Methods to Understand Variation 运用统计方法理解过程变动 |
|
SP 2.3 |
Monitor Performance of the Selected Subprocesses 监督选定的子过程性能 |
|
SP 2.4 |
Record Statistical Management Data 记录统计管理数据 |
CMMI 5级过程域: 组织革新与部署 | ||
SG1 |
Select Improvements 选择改进 | |
|
SP 1.1 |
Collect and Analyze Improvement Proposals 收集和分析改进建议 |
|
SP 1.2 |
Identify and Analyze Innovations 识别革新 |
|
SP 1.3 |
Pilot Improvements 试点改进 |
|
SP 1.4 |
Select Improvements for Deployment 选择用于部署的改进 |
SG2 |
Deploy Improvements 部署改进 | |
|
SP 2.1 |
Plan the Deployment 计划部署 |
|
SP 2.2 |
Manage the Deployment 管理部署 |
|
SP 2.3 |
Measure Improvement Effects 度量改进效果 |
CMMI 5级过程域: 原因分析与解决方案 | ||
SG1 |
Determine Causes of Defects 确定缺陷原因 | |
|
SP 1.1 |
Select Defect Data for Analysis 选择待分析的缺陷数据 |
|
SP 1.2 |
Analyze Causes 分析原因 |
SG2 |
Address Causes of Defects 解决产生缺陷的根源 | |
|
SP 2.1 |
Implement the Action Proposals 实施行动建议 |
|
SP 2.2 |
Evaluate the Effect of Changes 评价变更的效果 |
|
SP 2.3 |
Record Data 记录数据 |