- 博客(3)
- 收藏
- 关注
原创 Fourth assignment -- Prototype design
CLICK HERE => Our group’s Slides on 优快云CLICK HERE => Our group’s interface prototype design Axure is used for designing the interface. The person responsible for this task among us (usually the project leader or team coordinator) carefully studies
2024-11-15 22:08:46
1412
原创 Third assignment -- Demand Analysis
Analysis of possible key points and challenges during the assignment. (6 points) Division of labor among team members and the proportion of their contributions to the assignment. (16 points) To strengthen the division of labor and collaboration among team
2024-10-25 21:34:01
1497
空空如也
TA创建的收藏夹 TA关注的收藏夹
TA关注的人