EEE40007 Power System Operation and Control Test 1 Semester 2 2023C/C++

Java Python EEE40007

Power System Operation and Control

Test 1, Semester 2, 2023

Test 1 Questions

QUESTION 1 (15 MARKS)

Shown above is a 3-bus power system. The system parameters are given below, with all the impedance values in per unit of their respective power rating.

Generators 1 and 2:          100MVA, 20 kV, X1 = X2  = 0.20, X0  = 0.05

Transformers T1:              100 MVA, 20 ∆ / 345 Y kV, X = 0.05

Transformers T2:              100 MVA, 20 Y / 345 Y kV, X = 0.05

Transmission line:             X1  = X2 = 0.10, X0  = 0.30

The system is unloaded with bus voltages 1.0 per unit.

1)  Choose 100MVA as the power base and 345 kV as the voltage base in the transmission line. Find the positive, negative and zero sequence networks. Ind

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值