CCBS4020 Integrated Project Teaching Plan and Syllabus

「文智助手」全场景办公AI助理AI+OPC全流程实践方案(大赛作品) 阅读详情

CCBS4020 Integrated Project Teaching Plan and Syllabus

THE UNIVERSITY OF HONG KONG

HKU SPACE Community College

Integrated Project (CCBS 4020)

2024-25 Semester 2

Teaching Plan and Syllabus

I. Aims and Objectives

This course aims to provide students with an opportunity to associate real world business

environment with their business knowledge. With the supervision of the project advisor,

students are required to integrate and apply the key accounting, economics, finance,

management, and marketing theories learnt in the programme to analyse a business case

and develop workable plans to optimise their operations. These problem-solving skills

can help students to build a good foundation for further studies and their future careers.

The course provides valuable experiences in self-directed learning. Students can enhance

their communication and presentation skills as well.

II. Intended Learning Outcomes

On completion of the course, students should be able to:

1. apply the core accounting, economics, finance, marketing and management theories

and concepts to identify and analyse the real-world problems of the business case

being studied.

2. collect, analyse, and interpret data and information to examine complex business

cases.

3. integrate the core knowledge learnt in the programme with the data/findings

collected during the research process to develop business strategies or tactics.

4. write a viable business plan to convey effective communication and presentation

skills.

5. evaluate the ethical implications of various business decisions in real world scenarios.

III. Teaching Syllabus and Lectures

Lectures:

 External and internal environmental analysis and business proposal

 Marketing Plan and Business Objectives setting

 Human Resource Plan and Financial Plan

Integrated Project consists of the following activities:

 A business case will be given to students.

 Project advisors (lecturers) are assigned to help and supervise students which are

divided into groups (no more than six students in a group). There is a group leader

CCBS4020 Integrated Project Teaching Plan and Syllabus

to act as a contact point amongst group members and advisor.

 While working on the integrated project, student groups are required to meet with

their project advisors to report work progress and share drafts with all group

members in the weekly workshop.

Phase I CAnalyse a Business Case

 Analyse the current situation and problems encountered in the business case.

 Suggest an outline of actions plans to optimise its operations (Actions plans include

but not limited to operation details, budget and business forecasts and manpower

planning).

 Submit an initial report to the project advisor in accordance with the time schedule.

 Meet with project advisors for feedback.

Phase II C Final Report

Propose recommendations on measures and long-term solutions on:

- Financial projections

- Manpower Planning

- Marketing planning

 Submit a final report based on the comments of the project advisor in accordance

with the agreed schedule.

Phase III C PowerPoint and Oral Presentation

 Submit PowerPoint slides for presentation and a hardcopy of the presentation slides

before the presentation.

 Group oral presentation.

 Submit a self-reflection report and a peer evaluation form after the presentation.

IV. Assessment Scheme

To pass this unit, students must complete the following tasks. If any members are not

contributing professionally, the group leader must inform the supervisor as soon as

possible so that the problem can be resolved promptly.

During the semester, students are required to meet with their group members and project

supervisor to report their work progress and receive feedback. Attendance at all lectures

and workshops is mandatory.

Project Assessment Weighting

Submission Due

Date (HKT)

Environmental Analysis Report:

Between 3,000- and 4,000-words excluding

table of contents, appendices, and

references.

20% 23 February 2025

at 23:59 (Sunday)

Outline of the Marketing Plan:

 No more than 2,000 words excluding table

of contents

10% 9 March 2025

at 23:59 (Sunday)

CCBS4020 Integrated Project Teaching Plan and Syllabus

PowerPoint of the Finalised Marketing Plan:

 Not more than 20 slides.

Oral Presentation on the Finalised Marketing

Plan:

No more than 20 mins including 5 mins

Q&A session.

10% 30 March 2025

at 23:59 (Sunday)

Lecture 11

Final Business Plan:

 Between 6,000- and 10,000-words

excluding table of contents, appendices, and

references.

27 April 2025

at 23:59 (Sunday)

PowerPoint of the Final Business Plan:

 Not more than 35 slides.

 No oral presentation required.

10% 27 April 2025

at 23:59 (Sunday)

Individual Self-Reflection Report:

 Individual report of 800 words

10% 28 April 2025

at 23:59 (Monday)

Total 100%

Details of assessment are subject to changes.

Environmental Analysis Report (including Environmental Analysis Peer Evaluation if

necessary) C 20%

 Each group must submit the Environmental Analysis Report by the specified

deadline of 23 February 2025 at 23:59 HKT.

 The report should provide a thorough analysis of the internal and external factors

that will affect a new business operating in Hong Kong. For more details, please

refer to the environmental analysis report guidelines.

 Students are encouraged to apply theories from previous courses.

Outline of the Marketing Plan C 10%

 Each group must submit an Outline of the Marketing Plan by the specified deadline

of 9 March 2025 at 23:59 HKT.

 The outline should offer a structured overview of the key components of a

marketing plan. For more details, please refer to the outline of the marketing plan

guidelines.

 Students are encouraged to apply theories from previous courses.

Oral Presentation on the Finalised Marketing Plan & PowerPoint for the Finalised

Marketing Plan (including Marketing Plan Peer Evaluation if necessary) C 10%

Each group must submit a PowerPoint presentation of their finalised marketing plan

by the specified deadline of 30 March 2025 at 23:59 HKT.

 Students must deliver an oral presentation on the key components of their finalized

marketing plan during Lecture 11.

 The finalised marketing plan PowerPoint should effectively communicate the

marketing strategies, target audience, positioning, promotion strategies, and other

CCBS4020 Integrated Project Teaching Plan and Syllabus

essential elements of the plan. For more details, please refer to the finalised

marketing plan guidelines.

 The oral presentation should be well-prepared, engaging, and clearly convey the

team's understanding and application of the finalised marketing plan. Adherence to

the submission deadline and presentation schedule is essential.

Final Business Plan (including Final Peer Evaluation if necessary) C 40%

 Groups must adhere to the guidelines of the group project and submit their final

report by the designated deadline of 27 April 2025 at 23:59 HKT.

 The final report should encompass all the necessary components, such as the

marketing plan, human resources plan, financial plan for the new business, and

essential elements covered in this course. For more details, please refer to the final

business plan structure and guidelines.

 Students are encouraged to apply theories from previous courses.

 It is crucial to ensure that the final report is comprehensive, well-structured, and in

line with the provided guidelines. Adherence to the given deadline is essential to

avoid any late submission penalties.

PowerPoint of the Final Business Plan C 10%

 Each group is required to create and submit a PowerPoint presentation of their

business plan.

 The PowerPoint should highlight the key components of the business plan.

 All groups must submit their PowerPoint presentations on or before 27 April 2025

at 23:59 HKT.

Individual Self-reflective Report C 10%

 The self-reflection report is an individual writing task that requires each student to

summarise and reflect on their experience while working on the group project and

collaborating with group members.

 In the report, you should discuss your personal learning and growth in terms of

understanding and applying relevant concepts, theories, and knowledge during the

completion of the group project in this course.

 Each student must submit their report individually on or before 28 April 2025 at

23:59 HKT.

V. Recommended Reading

Reference Texts

1. Bailey, Stephen (2015), Academic Writing: A Handbook for International Students,

4th edition. London: Routledge.

2. Garrison, R. H., Noreen, E. W., & Brewer, P. C (2021), Managerial Accounting, 17th

edition, Mc Graw Hill

3. Bruce R. Barringer (2021), Preparing Effective Business Plans: An Entrepreneurial

Approach, 2nd Edition, Pearson Education.

4. Evans, Vaughan (2022), Financial Times Essential Guide to Writing a Business Plan:

How To Win Backing To Start Up Or Grow Your Business, FT Publishing

International.

5. Soloman, Michael G. & Russell, Cristel A. (2023), Consumer Behaviour: Buying,

Having, and Being, 14th Edition, Pearson Education.

CCBS4020 Integrated Project Teaching Plan and Syllabus

6. Charles W. L. Hill, Melissa A. Schilling, and Gareth R. Jones (2020), Strategic

Management: Theory: An Integrated Approach, 13th Edition, Cengage Learning.

7. Ledden, Emma (2017), The Presentation Book: How To Create It, Shape It and

Deliver It! Improve Your Presentation Skills Now, 2nd edition. Pearson Business.

8. Kotler, P. & Armstrong, G. (2021), Principles of Marketing, 18th edition, Pearson

Education.

9. Malhotra, Naresh K. (2019), Marketing Research: An Applied Orientation, Global

Edition, 7th Edition, Pearson.

10. Robbins S.P. & Coulter M (2021), Management, 15th edition, Pearson Education.

VI. Teaching Schedule

All groups must report their progress to their supervisor during the weekly workshop.

LECTURE TOPICS REMARKS

1

- Course Introduction

- Business Proposal

2

- Environmental Analysis

- Consultation Session /

Workshop

Group List & Business Proposal

Submission Due: 9 February 2025

at 23:59 HKT

3

- Marketing Plan

- Consultation Session /

Workshop

4

- Market Survey

- Consultation Session /

Workshop

5

- Human Resources Plan

- Consultation Session /

Workshop

6

- Consultation Session /

Workshop

7

- Financial Plan

- Consultation Session /

Workshop

8

- Consultation Session /

Workshop

9

- Consultation Session /

Workshop

10

- Consultation Session /

Workshop

11

- Oral Presentation (Finalised

Marketing Plan)

Business attire is required for the

oral presentation.

CCBS4020 Integrated Project Teaching Plan and Syllabus

6

12

Consultation Session /

Workshop

Remarks: The above schedule is subject to changes

Grade Descriptors

Grade descriptors show how a given level of performance will be reflected in a grade.

They act as general guidelines for the student and coordinator.

~ END ~

A Demonstrate an advanced level of understanding of the key concepts and

theories in different business functions and a detailed account of the business

planning and implementation process, as well as demonstrate strong ability to

develop and present a good-quality business plan that shows evidence of

original thought, analytical thinking, and presentation skills.

B Demonstrate a good understanding of the key concepts and theories in

different business functions with evidence on efforts to develop a business

plan, and an acceptable level of competence in analytical thinking and

CCBS4020 Integrated Project Project Guidelines

1

THE UNIVERSITY OF HONG KONG

HKU SPACE Community College

Integrated Project (CCBS 4020)

2024-25 Semester 2

Project Guidelines

1. Group Formation

? Students must form groups consisting of 5-6 members. If a group exceeds 6 members, final

approval from the lecturer is required.

? Each group should designate a Group Leader who will serve as the main point of contact

between the group and the lecturer.

? It is recommended that each group includes students from different academic disciplines,

such as Accounting, Finance, Management, and Marketing.

? Group list must be submitted by the specified deadline of 9 February 2025 at 23:59 HKT.

Save the group list as PDF file and upload it to the "Group List Collection Box".

2. Project Guidelines

a) Project Overview:

? Each group will develop a comprehensive business plan for a unique Learning and

Development Centre or Skill Development Centre in Hong Kong. The centre will focus

on teaching specific skills and fostering personal growth or wellness, with an emphasis on

integrating cutting-edge technology and holistic approaches.

? The business plan should include progressive lessons that learners can advance through,

ensuring a structured and continuous learning experience.

? The plan should incorporate innovative solutions that cater to the modern needs of

learners, ensuring the business model is competitive and relevant to current trends and

demands in Hong Kong's dynamic environment.

? It is essential to ensure that the business plan is practical and feasible within the context

of Hong Kong's market.

? The centre will operate as a subsidiary of a Hong Kong-based corporation that is registered

in Hong Kong, conducts local business operations, and is listed on the main board of the

Hong Kong Stock Exchange, showcasing its strong local business presence.

? The selection of the Hong Kong-listed corporation for this venture must be approved by

the lecturer. It is essential that the centre aligns with the corporation's strategic objectives

and offers potential benefits to the corporation.

? The centre is scheduled to launch on 1 October 2025, operating under standard business

conditions.

? The business proposal must be approved by the lecturer during Lecture 2.

b) Funding and Budget:

? Each group should only consider developing the business using retained earnings from the

Hong Kong-based corporation, without external financing through the issuance of new

CCBS4020 Integrated Project Project Guidelines

2

stock shares or bank loans. The budget for the centre should be between HK$5 million

and HK$10 million, fully funded by the chosen Hong Kong-based corporation.

c) Project Management and Communication:

? Throughout the duration of the project, each group must actively seek advice from the

lecturer, report any significant issues that arise within the group, and attend the weekly

lectures, consultation sessions and/or workshops. Please note that the schedule for

consultation sessions may be subject to change.

? To ensure effective communication and record-keeping within the group, each team is

required to utilise the provided Minutes of Group Meeting template. This template should

be used to document detailed information regarding the topics discussed in each meeting.

3. Project Assessment

Project Assessment Weighting

Environmental Analysis Report: between 3,000- and 4,000-words excluding table

of contents, appendices, and references.

20%

Outline on the Marketing Plan: no more than 2,000 words excluding table of

contents.

10%

PowerPoint of the Finalised Marketing Plan: not more than 20 slides.

Oral Presentation on the Finalised Marketing Plan: no more than 20 mins

including 5 mins Q&A session.

10%

Final Report: between 6,000- and 10,000-words excluding table of contents,

appendices, and references.

40%

PowerPoint of the Business Plan: not more than 35 slides. No oral presentation

required.

10%

Individual Self-reflective Report: no more than 800 words excluding table of

contents.

10%

Total 100%

4. Report and Presentation Guidelines

a) General Report Requirements:

 All written reports must include a standard cover page.

 Use appropriate headings and subheadings to divide the report into sections and

subsections.

b) Formatting:

 The Environmental Analysis Report, Outline of the Marketing Plan, and Final Business

Plan should be typed and printed on A4 size paper with the following margins: left: 40mm,

right: 30mm, top: 25mm, bottom: 25mm.

 Use Times New Roman 12pt font with 1.5 line spacing.

Page numbers should be centred at the bottom of each page.

c) Word Counts:

CCBS4020 Integrated Project Project Guidelines

 The Environmental Analysis Report should be between 3,000 and 4,000 words (excluding

the table of contents, appendices, and references).

 The Outline of the Marketing Plan should not exceed 2,000 words.

 The Final Business Plan should be between 6,000 and 10,000 words (excluding the table

of contents, appendices, and references).

d) Presentations:

 The finalised marketing plan PowerPoint should not exceed 20 slides, excluding the last

slide, which includes the slide numbers completed by each group member. It should

include appropriate visual illustrations, such as pictures, diagrams, or charts, in addition

to text.

 The allotted time for the Oral Presentation of the Finalised Marketing Plan should not

exceed 20 minutes, including a 5-minute Question and Answer (Q&A) session.

 The final business plan PowerPoint should not exceed 35 slides, excluding the last slide,

which includes the slide numbers completed by each group member. It should include

both text and visual illustrations, such as pictures, diagrams, or charts.

e) Group Assignments:

 In group assignments, all members of the group will generally receive the same marks.

 Peer evaluation forms will be provided to assess each member's contribution to the

Environmental Analysis Report, Outline of the Marketing Plan, Finalised Marketing Plan

PowerPoint presentation, Final Business Plan, and PowerPoint presentation of the

Business Plan.

 Each group member will rate the contributions of other group members. If a member

receives a poor rating, their mark for the assessed assignment will be deducted

accordingly. It is important for all students to contribute fairly to the project.

5. Resolution of Conflicts within the Group

A group is formed by individuals working together towards a common goal. However,

differences in communication and working styles among group members may lead to conflicts

that can impede progress.

When conflicts arise, students should:

 address problems as they arise instead of ignoring them;

 discuss any issues in the presence of all group members;

 avoid blaming each other for past failures and instead focus on identifying necessary changes;

 strive to reach a mutual understanding that all group members agree upon.

Each group has one opportunity to remove a non-contributing member after the submission of

the Environmental Analysis Report, using the peer evaluation system. Each member can submit

the Environmental Analysis Peer Evaluation Form, along with valid supporting documents such

as the Minutes of Group Meeting and group conversation records, to demonstrate that the

concerned member has not made any contribution to the group project. The deadline for

submitting these documents is 23 February 2025 at 23:59 HKT. The lecturer will make the final

decision on whether the concerned member will be allowed to continue working in the group or

will be asked to work on the remaining parts of the project alone. This decision will be

communicated on or before 1 March 2025. It is important to note that no group member can

CCBS4020 Integrated Project Project Guidelines

be removed after 1 March 2025. For any subsequent issues with group members, the peer

evaluation system can be used to report non-contributing members.

If conflicts persist or further assistance is needed, students should seek help and advice from their

supervisor.

6. Attitude of the Group

Each group is responsible for taking the initiative to seek advice from the supervisor and keeping

the supervisor informed of their progress. It is important to actively engage with the supervisor

and maintain open lines of communication throughout the project.

Please note that the project supervisor may provide feedback, both positive and negative, on your

work. Embrace this feedback as an opportunity for growth and improvement.

presentation with few errors.

C Demonstrate a satisfactory understanding of the key concepts and theories in

different business functions, and ability to develop a business plan with

limited use of analytical and critique techniques. Also, the presentation is not

well-organised.

D Demonstrate limited understanding of the key concepts and theories in

different business functions, and limited ability to develop a business plan.

There is limited evidence of analytical thinking as well as the presentation is

not well-structured and organised.

F Show no or little knowledge of the key concepts and theories in different

business functions, and lack of ability in developing a business plan. The

presentation is incoherent and unstructured.

船载 OpenHarmony AIS 航海工作台:告警与防碰撞预警系统 船载OpenHarmony AIS航海工作台的告警与防碰撞系统,集成十余类告警(超速、偏航、会遇、SOS等),通过网格空间索引实现高效邻近判定,保障实时性。告警管理器统一调度规则、去重、通知与日志,支持悬浮球、语音、跑马灯、弹窗多渠道触达,确保航行安全。SOS紧急通道独立运行,避免干扰。系统设计强调性能优化与多场景适配,为航海安全提供核心支撑。 阅读详情

相关推荐

AI 应用开发:四维架构落地实战——以 HR Agent 为例拆解感知·推理·记忆·执行【意图路由、规划编排、长期记忆、工具执行、面试题】

本文基于四维架构(感知·推理·记忆·执行),以HR Agent为例,系统拆解大模型应用从“聊天”到“生产可用”的落地路径。通过Spring AI实现意图路由、规划编排、RAG检索与工具调用,结合真实踩坑复盘,揭示架构化设计对安全、成本与可维护性的关键价值,为AI Agent工程化提供可复用的实战框架。

王大师企业官方博客 1307

AI 问数真的能替代 BI 报表吗?

AI问数赋能自然语言查询,提升临时分析效率,但无法替代传统报表。报表适用于稳定输出与持续监控,AI则擅长探索性提问。企业用好AI问数,关键在于夯实数据模型、统一指标口径、健全权限体系与结果校验机制。合理组合报表、仪表板与AI,才能实现高效、准确的业务洞察。

葡萄城技术团队博客 333

C++中const和指针*的组合问题

今天在复习> 章节7.3的时候想到以前做的一个题,const和指针运算符*的若干种组合的合法性和意义问题,有点混淆,所以写了一个测试代码来验证一下,简单明了,一目了然。如果有什么遗漏的话欢迎指出。 首先是在Ubuntu14.04.1下用gcc 4.8.4编译运行的结果,编译器报错信息都附加在对应语句后面的注释里 /* * Note : Test for the combinations of

theColdOne的专栏 1085

【从零理解 Spring AI · 12】MCP 的两种角色:做客户端还是做服务端

上一篇讲了 MCP 的概念:标准协议、三大角色、M+N 替代 M×N。

nice_lcj520的博客 612

RK3588网络调试笔记:当我把默认RTL8211F PHY换成另一款时,踩了哪些坑?

本文详细记录了在RK3588平台上将默认RTL8211F PHY芯片替换为其他型号的全过程,包括硬件设计验证、内核驱动适配、复位时序配置等关键步骤。通过实际案例分享,提供了从驱动调试到硬件优化的系统性解决方案,帮助开发者高效完成PHY芯片替换,确保网络接口稳定性。

weixin_30291791的博客 669

ThinkPHP+Layui开发的ERP管理系统

ERP采购生产销售系统,一款基于ThinkPHP+Layui开发的ERP管理系统,帮助中小企业实现ERP管理规范化,此系统能为你解决五大方面的经营问题:1.采购管理 2.销售管理 3.仓库管理 4.资金管理 5.生产管理,适用于:服装鞋帽、化妆品、机械机电、家具装潢、建材行业、快销品、母婴用品、办公用品、汽配汽修、生鲜农贸、手机通讯、数码家电、医药用品、制造业、信息技术服务行业等。提供全部无加密服务端和前端源代码,独立部署,不受限制。

u011092458的博客 789

ChatGPT、Perplexity、Gemini 与 AI Overviews 引用对比:谁的引用更可信

AI 引擎的引用机制差异很大:ChatGPT 以行内引用加 Sources 列表呈现来源,Perplexity 几乎逐句可溯源,Gemini 在回答中内嵌相关来源链接,AI Overviews 则把多源聚合答案与来源列表一起放在搜索结果顶部。本文从引用透明度、来源偏好、可干预性 3 个维度对比这 4 个引擎,并给出 GEO 的 3 点启示,帮企业在多引擎环境下提升被引用的概率。

淡然一笑 的专栏 266

从SAS接口到InfiniBand:一张图看懂数据中心硬件‘黑话’(SFF-8643/8644、QSFP112、NDR/HDR/EDR)

本文深入解析数据中心硬件术语,从SAS接口标准(SFF-8643/8644)到速率标识(NDR/HDR/EDR),帮助工程师快速理解关键性能指标。特别对比了PCIe卡规格(HHHL/FHHL)和光模块选择(QSFP112/OSFP),并探讨InfiniBand在高性能网络中的优势,为硬件选型提供实用指南。

weixin_32103009的博客 433

抽象主义人工智能和生命体AI的内在联系

彭军辉提出“抽象主义人工智能”作为第四大AI范式,批判符号主义、连接主义、行为主义剥离生命本体的误区,确立“智能是现象,生命是本体”的核心公理。主张原生智能必须依附具备存续诉求的生命本体,提出“生命体AI理论”,构建七层演化阶梯与自闭环工程框架,强调智能不可跳过底层存续机制直接模拟语言。该体系为生成式AI提供科学边界,推动从“仿真表象”向“原生智能”的范式跃迁,开辟硅基人工生命新赛道。

抽象主义人工智能和生命体AI 203

AMD KFD的SDMA Packet 类型和定义解析

本文详细分析了AMD GPU架构中的SDMA(System Direct Memory Access)数据传输机制,重点介绍了其核心数据结构——SDMA Packet。SDMA通过8种主要Packet类型(包括内存拷贝、数据写入、屏障同步、中断触发等)实现高效主机-设备通信。每种Packet采用位域结构和联合体封装设计,在保证功能完整性的同时实现空间优化。这些Packet支持丰富的访问属性和扩展字段,适用于高性能数据搬运、内存初始化、任务同步、性能分析等场景,为GPU计算提供了灵活高效的数据传输解决方案。

图形/计算GPU的驱动与虚拟化技术分享园地 1256

【腾讯小龙虾WorkBuddy专栏01】初识WorkBuddy!定位、核心优势、功能界面全解析

【腾讯小龙虾WorkBuddy专栏01】初识WorkBuddy!定位、核心优势、功能界面全解析

AI人人懂 3898

OpenAI Control Room 架构拆解:给企业 AI Agent 加一套可审计的急停系统

OpenAI 公开了用于追踪和停止研究模型工作负载的 Control Room。本文拆解 job_id、推理前鉴权、35 秒撤销窗口与 Fail Closed 设计,并给出企业 AI Agent 急停控制面的数据模型、FastAPI 参考实现、缓存撤销策略和故障演练清单。

jerry764的博客 335

KEPServerEX 6 之驱动协议(UDD)实战 HTTP协议对接OpenWeatherMap天气 API全流程指南

本文分享了基于 KEPServerEX 6 的通用设备驱动(UDD)对接OpenWeatherMap天气API的实战方案。该方案针对工业物联网场景进行了深度优化,具有动态城市切换、运行时热配置、老旧JS引擎兼容等核心特性。文章详细介绍了从环境准备、脚本部署到Tag配置的全流程,重点解析了Legacy JS语法适配、Float类型安全处理等关键实现细节,并提供了完整的避坑指南和故障排查方法。该方案经过生产环境验证,可稳定实现气象数据采集与动态切换功能,适用于SCADA/MES系统集成场景。

-雲飛兄-博客 744

OpenClaw 深度调查:把 AI 助手做成你自己的控制平面

对 openclaw/openclaw 的完整技术尽调:Gateway 架构、Agent 运行时、工具与沙箱、30 个消息通道、181 个插件、安全信任边界、工程代价与采用建议。17 章 / 10 张图,全部数字标注口径,数据截至 2026-10-31。

厚积薄发 343

HLA分型

HLA分型 一、根据WES的tumor数据进行数据分型 选用hlahd 软件安装及使用 [root@18605fd8771e ~]# wget https://jaist.dl.sourceforge.net/project/bowtie-bio/bowtie2/2.4.1/bowtie2-2.4.1-linux-x86_64.zip [root@18605fd8771e ~]# unzip bowtie2-2.4.1-linux-x86_64.zip && mv bowtie2-2.4.1

qq_23435961的博客 2492

Camera2Demo

在Camera2 的基础上进行封装,使得Camera2一堆初始化逻辑与Activity分离,降低耦合度,完成预览拍照并保存的操作

AI赋能智慧港口建设|造形家快速生成港口全要素三维场景

随着智慧港口、港口数字孪生项目的持续推进,港口三维场景的需求日益旺盛。传统港口三维建模,往往需要航拍倾斜摄影采集数据,再人工搭建吊机、岸桥、船舶、集装箱等大量工业设施模型,项目周期长、人力成本高,修改迭代繁琐,制约港口可视化项目落地效率。国产AI三维建模工具,依托卫星影像 AI 识别能力,无需航拍作业,一键快速搭建港口完整三维场景,为港口数字孪生、方案汇报、投标演示提供高效的场景解决方案。

m0_69539167的博客 83

android 蓝牙通讯demo

android 下蓝牙通讯demo,实现了发现蓝牙,使能蓝牙,通过蓝牙发送消息。

从设备增点到治理闭环:老旧小区物业数智化落地实践

系统连接合同审批、银行流水、收费记录与项目台账,执行到期提醒、收入核验、异常标色和月度对账,让每一笔资金来源明确、去向可查。针对设施老旧、诉求响应慢、公共收益不透明等问题,津南以6类小区为试点场景,统一建设物业数字化底座,关联楼栋、单元、房屋、业主、空间、设施设备、工单、公共收益等核心数据。系统采用统一编码管理,将摄像头、路灯、井盖、道路、绿化等设施纳入资产台账,解决纸质记录更新滞后、故障责任难追溯的问题。基于历史工单建立分类模型和知识库,辅助识别照明、给排水、电梯、环境秩序、秩序维护等问题;

wuyeshuzhihua的博客 156

精雕软件(JDpaint) 5.5 绿色版

精雕软件(JDpaint) 5.5 绿色版精雕软件(JDpaint) 5.5 绿色版精雕软件(JDpaint) 5.5 绿色版

WINCC7.3破解文件

WINCC7.3硬件够破解文件,有需要的下载!WINCC7.3硬件够破解文件,有需要的下载!

企业微信iPad协议详解:接口接入、实时消息同步与语音转码实践

深入解析企业微信iPad协议的技术架构与开发思路,涵盖API接口接入、长连接通信、实时消息同步、Silk语音转码、异常重连及高并发优化,帮助开发者了解企业微信自动化系统的设计与实现。

欢迎来到祖安! 508

Product Hunt 热榜 2026-11-13:Plurai Simulation、YouArt Desktop App、Omnigraph

2026-11-13 Product Hunt 新产品精选:Plurai Simulation、YouArt Desktop App、Omnigraph。汇总 15 款产品的中文介绍、功能关键词和产品链接。

LaughingZhu的博客 610

【AI Agent面试系列】AI Agent可观测、评测、安全相关的知识点

之前的文章介绍了和,本文主要介绍AI Agent的测评、可观测等知识。

390

Docling 原理解读:是什么、为什么、怎么样

从论文视角拆解 Docling 的整体架构、DoclingDocument 数据模型、PDF 预处理、版面分析、OCR、TableFormer 双解码器、阅读顺序与装配流程,并解释版面框与 OCR 框的区别。

PLANTTHESON的博客 401

WorkBuddy 实战:一句话需求 → 七屏可交互原型,户外徒步 App 的 AI 设计全流程

WorkBuddy 实战:一句话需求 → 七屏可交互原型,户外徒步 App 的 AI 设计全流程,跟着博主一起来还原整个过程。

夜郎King的博客 5139

从认识人工智能到理解机器学习:我的 AI 入门第一课

正式开始学习人工智能之前,我对 AI 的认识其实比较模糊:知道 ChatGPT、知道大模型,也知道现在很多岗位都在谈 AI,但如果有人问我“人工智能到底是什么”“机器是怎么学会识别一只猫的”,我未必能从头到尾讲清楚。上午的课程更偏向行业全景:人工智能的发展、研究方向、NLP、岗位分工、学习路线和 AI Coding 工具。下午的课程更偏向技术基础:机器学习的原理、有监督学习、深度学习、模型训练和评估方法。

chh563的博客 555

企业宣传片发前如何批量排查并遮挡视频里的敏感信息

做企业视频的人都会碰到一个具体问题:实拍画面里混进了不该出现的信息。办公室背景里有贴着客户信息的白板,采访对象的授权书边缘露出一串身份证号码,街采素材里路人面孔和车牌号直接入镜。人眼在时间线上扫视,会漏掉快速闪过的帧、画面边缘的小字、以及暗光区域里的证件号码。用抹影AI完成车牌、人脸和证件区域批量检测后,又手动补充了两个时间段的屏幕遮罩,最终导出时画面已无合规隐患。重点关注快速运动、遮挡、低光照条件下的目标,这些是漏检的高发区域。导入视频后选择要检测的目标类型(人脸、车牌、证件号、二维码等)。

Mysssone的博客 180

SAP商业AI正式通过网信备案:企业落地AI五问

中数通“CDC商业AI”通过广东网信部门备案,标志着SAP商业AI在华本地化迈出关键一步。然而,合规仅是起点,企业真正需关注的是:AI能否融入核心流程、数据治理是否健全、责任归属是否清晰、价值衡量机制是否建立。从“可用”到“用好”,关键在于工作流重构、跨团队协同与业务结果导向的评估体系。国产模型成本优势与本地部署能力为ERP深度集成提供可能,但真正的竞争力仍在于对数据、流程与业务上下文的理解力。

Acloudear的博客 213

面向工业对讲的双通道声学 DSP 模组 A-59(NR2050-A)方案解析与工程落地案例

A-59模组以NR2050-A DSP为核心,37.5×16mm邮票孔封装,支持-40℃~85℃工业温域,兼容A-06/A-09/A-29系列,可低成本替换存量设备。通过固件切换实现三种模式:模式一(低改版成本,适配矿井、电梯);模式二(最优AEC,用于医院呼叫);模式三(双波束独立输出,支持双人会议语音分离)。集成AEC、ENC、BF与AGC算法,有效抑制回声、噪声与串扰,解决对讲系统核心声学难题。选型需注意参考信号路径、麦间距与温度匹配,建议先做声学测试再量产。

R190_6589的博客 366
上一篇: 0CCS0CSE Introduction to CS Engineering
下一篇: The programmable rendering pipeline
wx____codehelp
博客等级 码龄2年 538粉丝 99原创
评论
成就一亿技术人!
拼手气红包6.0元
还能输入1000个字符
 
 条评论被折叠 查看
添加红包

请填写红包祝福语或标题

个

红包个数最小为10个

元

红包金额最低5元

当前余额3.43元 前往充值 >
需支付:10.00元
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付元
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值