CMMI was formed by merging multiple CMM models like CMM for software, CMM for Systems Engineering, CMM for Integrated process and product development etc. As managing multiple CMM models is difficult, SEI integrated all CMM models into one - CMM Integrated. The structure and essence of CMMI is same as that of CMM. As in CMM, in CMMI also there are 5 levels of maturity

Level 1 : Initial or Ad-hoc. There are no PAs (Process Areas) in this level

Level 2 : Managed. There are 7 PAs. PAs at this level look at project planning and execution (Basic project management)

Level 3 : Defined. There are 13 PAs here. Life cycle processes and Organizational processes are the focus areas here.

Level 4 : Quantitatively Managed. There are 2 PAs that deal with project management with quantitative data and statistical process control. (SPC)

Level 5 : Optimizing. There are 2 PAs. The focus is on continuous improvement.

There are 24 PAs in all. PAs are activities where Software organizations and Projects have to focus in the path towards excellence and maturity.

What are the characteristics of a mature organization ?

A mature software organization possesses an organization-wide ability for managing software development and maintenance processes. The software process is accurately communicated to both existing staff and new employees, and work activities are carried out according to the planned process. The processes mandated are fit for use and consistent with the way the work actually gets done. These defined processes are updated when necessary, and improvements are developed through controlled pilot-tests and/or cost benefit analyses. Roles and responsibilities within the defined process are clear throughout the project and across the organization.

The CMM / CMMI model was designed to guide software organizations in selecting process improvement strategies by determining current process maturity and identifying the few issues most critical to software quality and process improvement. As we move from Level 1 to 5, the project risk decreases & Quality and Productivity increases.

转载于:https://www.cnblogs.com/woodking/archive/2007/01/16/621486.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值