BOM selection in Subcontracting PO

本文讨论了在SAP系统中使用子合约采购订单时如何选择物料清单(BOM)的问题。提出通过维护多个生产版本并分配给子合约信息记录的方法来实现不同BOM的选择,并介绍了在采购订单级别重新展开BOM的具体步骤。

http://scn.sap.com/thread/1891851

BOM selection in Subcontracting PO

This question has been Answered.

SAP CONS Steel

Dear Guru's,

We are using subcontracting Purchase Orders. For one material we are having more than one BOM. We want to select either of them while exploding BOM in purchase order. Please suggest the settings

Regards,

SAP CONS

Ken Choy
Correct Answer  by Ken Choy  on Feb 14, 2011 10:59 AM

I have a similiar situation and I do it in this way.

 

1. Maintain two production versions, one for each BOM you have

2. Assign the default production version to the subcontracting info record

3. When you create subcon PO, the default production version is used. If you want to change it, go in the item level "Material Data" Tab, click "Re-explode" and choose the production version you want

 

Maybe there's some better way around, but that's the way I used. Hope it helps.

 

 

转载于:https://www.cnblogs.com/jefflu2012/p/3434656.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值