如何正确删除WBS下的Planned Independent Requirement

本文介绍了SAP系统中独立需求管理的概念,包括计划独立需求(PIR)与客户独立需求(CIR)的区别及如何共同构成独立性质的需求。此外,还讨论了在WBS下存在物料采购类型为计划独立需求时,若尝试删除WBS可能会遇到的问题,并提供了具体的解决步骤。

摘要生成于 C知道 ,由 DeepSeek-R1 满血版支持, 前往体验 >

先转一下定义:

Planned Independent Requirements is a SAP technical term for forecasts. Customer Independent requirements is a SAP technical term for sales orders. Based on requirement strategy CIRs can consume PIRs at specific statuses of sales orders. PIRs and CIRs together thus form the demand of independent nature. There are demands of dependent nature like Distribution Demand due to Purch Reqs at different location or dependent demands on the componets arising out of a planned order at header level. All these together consititute Total Demand.

 

WBS下有一个物料,其采购类型为Planned Independent Requirement

clip_image002

clip_image002[4]

当给WBS做删除标记时,产生错误代码CJ 001: There are still indep. requirements.

clip_image002[7]image

 

方法: 根据note 135807对Planned Indep. Rqt.进行重建.

1.  MD74 (RM60RR20): Adjusting Requirements

2.  MD75 (RM60RR30): Delete Old Requirements Records

3.  MD76 (RM60RR40): Delete History and Independent Requirements

注意:

- 如果planned independent requirements are created without history, 仅需要使用MD74和MD75进行重建.
- 如果planned independent requirements exist without schedule lines (thus, only the item record and possible history records exist), 仅使用MD76进行重建.

转载于:https://www.cnblogs.com/lazymango/archive/2011/02/22/1961290.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值