Employment Planning
Time Limit: 2000/1000 MS (Java/Others) Memory Limit: 65536/32768 K (Java/Others)
Total Submission(s): 1288 Accepted Submission(s): 481
Problem Description
A project manager wants to determine the number of the workers needed in every month. He does know the minimal number of the workers needed in each month. When he hires or fires a worker, there will be some extra cost. Once a worker is hired, he will get the salary even if he is not working. The manager knows the costs of hiring a worker, firing a worker, and the salary of a worker. Then the manager will confront such a problem: how many workers he will hire or fire each month in order to keep the lowest total cost of the project.
Input
The input may contain several data sets. Each data set contains three lines. First line contains the months of the project planed to use which is no more than 12. The second line contains the cost of hiring a worker, the amount of the salary, the cost of firing a worker. The third line contains several numbers, which represent the minimal number of the workers needed each month. The input is terminated by line containing a single '0'.
Output
The output contains one line. The minimal total cost of the project.
Sample Input
3 4 5 6 10 9 11 0
Sample Output
199
Source
Recommend
Ignatius
状态:
设d[i][j]表示第i个月有j个雇员的最小花费
状态转移方程:
d[i][j]=min{d[i-1][k]+w(j,k)} (month[i-1]<=k<=maxs)
if(j>k)w(j,k)=(j-k)*a+b*j//需要雇佣j-k个人
if(j<k)w(j,k)=(k-j)*c+b*j//需要裁员k-j个人
边界:
d[1][i]=(a+b)*i
others d[i][j]=INF
参考了 白杨 的代码
代码:
本文介绍了一个用于解决项目人员配置及成本优化的问题算法。通过动态规划方法,在已知每月最低用工需求、招聘解雇成本和工资的基础上,计算出全年最低总成本。文章提供了详细的算法思路与实现代码。