Using the configapp.exe from the bins

本文提供了一套详细的红外触摸屏校准流程,包括摄像头与投影仪设置、配置文件更新及参数调整等步骤,帮助读者顺利完成校准。

摘要生成于 C知道 ,由 DeepSeek-R1 满血版支持, 前往体验 >

After some extensive testing and help from a few guys on the irc, i came up with the following calibration sequence:

1. Choose the setup wisely: how to point your camera to the ftir and how to setup your projector. I set up my projector so that everything is readable on the screen, nothing upside down, nothing mirrored. My cam however is upside down, otherwise the body of it would be insde the beam of the projector.
2. in the folder where your touchlib bins are, throw away the config.xml, a new one will be created. I did this to start of with a clean setup.
3. run the configapp.exe
4. choose you webcamsettings. I’m using my old creative webcam 3, modified to only get IR light in
5. a dos window and six video windows will show up: configure in sequence. First Threshold, then brightness and contrast, lastly level.
threshold = more blobs get through when threshold is low and vice versa
brightness and contrast = play around with it, you’ll see what’s happening -> go for a clear black and white look, no grays
level = more blobs get through when level is low and vice versa
When you are happy go to the next step.

6. Press “enter”. You will now see two grids, one with green crosses, one with red crosses. Don’t mind the red ones, but take notice of where they are. The green ones will turn red in a moment, and it’s hard to find them between the red ones, once you started calibrating.
7. Press “c”. This will start the calibrating process. One green cross will have turned red. It’s in one of the corners, find it!
8. Touch the screen on the red cross ( the green one that just turned red after pressing “c” ) A box, confirming your press will show up, also the coordinates of that box will be shown in the dos window.
9. after you are satisfied that where you pressed is the same as the box (box actually under your finger) , lift your finger.
10. Press “Space”. The next green cross on the grid will turn red.
11. Repeat steps 8 to 10 until you had all the crosses
12. When you have reached and touched the last cross and pressed “Space” for the last time, the dos window will say “calibration done”
13. Press “escape”. The new config.xml file will be stored in the correct location.

After this is done, I ran the configapp.exe for a second time, with the new xml. Just to make sure the calibration was correct. And it was. But i think it’s not a bad idea to run it twice, just to be sure.

After this, run the smoke.exe…….. you’ll love it

I hope this helps a lot of you and I hope that WhiteNoiz is ok with me posting this little help.

Keep it going guys

 
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值