1 .Find move-type X09 po order (ME2M)

2. X09 posting

3. X10 posting

4. Summary
1.When we use migo with po.if he post it . we can discover it in here.

2.ME28 is for approving.
3. x09 and x10 we use po for doing it.
4. X09 we must post it before the order.
5. When it is very solwly when posting it , Enhancement is added.
本文详细介绍了ERP系统中Findmove-type X09用于创建ME2M采购订单的过程,以及X09和X10发布在订单确认与执行中的关键作用。X09通常在订单创建前进行,而X10则涉及订单的后续处理。在处理速度较慢的情况下,可能需要进行系统优化以提升效率。
1882

被折叠的 条评论
为什么被折叠?



