SAP SD Sample Certification Questions in Sales Order Processing

本文提供了一系列SAP SD认证考试的样例题目及答案解析,涵盖销售订单处理中的货物出库、开票、调度行确定等关键业务流程。通过模拟试题帮助考生熟悉考试形式和内容。

摘要生成于 C知道 ,由 DeepSeek-R1 满血版支持, 前往体验 >

SAP SD Sample Certification Questions in Sales Order Processing

To take the SAP SD  certification, contact your local or regional SAP Education training center at this url :

http://www.sap.com/services/education/index.epx

Caution: more than one answer may be correct.
Please mark ALL correct answers.

Question:
Which statements concerning goods issue are true?

 A   Goods issue reduces requirements in materials planning
 B   Goods issue posts value changes to the stock account in inventory accounting
 C   Goods issue posts value changes to the stock account in asset accounting
 D   Goods issue posts value changes to the tax account
 E    Goods issue reduces warehouse stocks

Question:
Which of the following statements about billing are correct?

 A.  Invoice dates for creating invoices at certain times are maintained in the calendar.
 B.  You cannot carry out pricing again during billing.
 C.  A transaction-specific requirement, such as "deliveries must be combined in a collective invoice" can be set to control
       billing.
 D.  If there are several payers for one delivery, only one billing document is created for each player.

Question:
How is the schedule line determined?

 A.  Item category and document type
 B.  Item category group and strategy group on the material master record
 C.  Item category and MRP type on the material master record
 D.  MRP Type and shipping point

Question:
When processing a billing due list, you have the following options:

A.  The invoicing run can be started as a simulation run.
B.  For performance reasons, the invoicing run via billing due list processing can only be carried out in batch.
C.  The invoice run can be carried out for delivery-related and order-related billing documents simultaneously.
D.  Order-related billing documents and delivery-related billing documents must always be created separately.

Question:
How does the SAP system enable you to check the reason for documents not being combined in a billing document?

A.  Using the Spilt analysis function in the environment menu of the billing document.
B.  Control of the document flow.
C.  Control of the billing log.

Question:
How is the schedule line determined?

A.  Item category and document type.
B.  Item category group and strategy group on the material master record.
C.  Item category and MRP type on the material master record.
D.  MRP Type and shipping point.

Answers for SAP SD Certification Sample Questions

Question: Cutover strategy
Q: Please explain cut over strategy procedure?  Will the system golive 100% at the same time and cut the legacy system or will it be like 20% first day and 50% next day like that ?

A: Cutover strategy depends upon how the organizations design their data load strategies.  Normally, you decide the sequence of Data loads for Configuration settings, Master data, Transaction data which follows whom and then you make a copy of the system as a Production system a day before and after checking the successful data loads, you go-live 100% or partial again depending upon organizational setup and policies.

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值