City X consists of n vertical and n horizontal infinite roads, forming n × n intersections. Roads (both vertical and horizontal) are numbered from 1 to n, and the intersections are indicated by the numbers of the roads that form them.
Sand roads have long been recognized out of date, so the decision was made to asphalt them. To do this, a team of workers was hired and a schedule of work was made, according to which the intersections should be asphalted.
Road repairs are planned for n2 days. On the i-th day of the team arrives at the i-th intersection in the list and if none of the two roads that form the intersection were already asphalted they asphalt both roads. Otherwise, the team leaves the intersection, without doing anything with the roads.
According to the schedule of road works tell in which days at least one road will be asphalted.
The first line contains integer n (1 ≤ n ≤ 50) — the number of vertical and horizontal roads in the city.
Next n2 lines contain the order of intersections in the schedule. The i-th of them contains two numbers hi, vi (1 ≤ hi, vi ≤ n), separated by a space, and meaning that the intersection that goes i-th in the timetable is at the intersection of the hi-th horizontal and vi-th vertical roads. It is guaranteed that all the intersections in the timetable are distinct.
In the single line print the numbers of the days when road works will be in progress in ascending order. The days are numbered starting from 1.
2 1 1 1 2 2 1 2 2
1 4
1 1 1
1
In the sample the brigade acts like that:
- On the first day the brigade comes to the intersection of the 1-st horizontal and the 1-st vertical road. As none of them has been asphalted, the workers asphalt the 1-st vertical and the 1-st horizontal road;
- On the second day the brigade of the workers comes to the intersection of the 1-st horizontal and the 2-nd vertical road. The 2-nd vertical road hasn't been asphalted, but as the 1-st horizontal road has been asphalted on the first day, the workers leave and do not asphalt anything;
- On the third day the brigade of the workers come to the intersection of the 2-nd horizontal and the 1-st vertical road. The 2-nd horizontal road hasn't been asphalted but as the 1-st vertical road has been asphalted on the first day, the workers leave and do not asphalt anything;
- On the fourth day the brigade come to the intersection formed by the intersection of the 2-nd horizontal and 2-nd vertical road. As none of them has been asphalted, the workers asphalt the 2-nd vertical and the 2-nd horizontal road.
注意:审清题。
#include<stdio.h>
#include<string.h>
int main()
{
int n,a,b,x[100000],y[100000];
memset(x,0,sizeof(x));
memset(y,0,sizeof(y));
scanf("%d",&n);
int f[100000],k=0;
memset(f,0,sizeof(f));
for(int i=0; i<n*n; i++)
{
scanf("%d%d",&a,&b);
if(x[a]==0&&y[b]==0)
{
x[a]=1;
y[b]=1;
f[k++]=i;
}
}
for(int i=0;i<k;i++)
{
if(i==0)
printf("%d",f[i]+1);
else
printf(" %d",f[i]+1);
}
printf("\n");
return 0;
}
本文介绍了一个关于城市道路铺设的算法问题。在一个由垂直和水平无限延伸的道路构成的城市中,每条道路都有编号,并形成交叉路口。为了更新老旧的砂石路面,工人团队制定了一个铺设计划。本文详细解释了如何确定哪些天将实际进行道路铺设工作。
375

被折叠的 条评论
为什么被折叠?



