CONFIGURATION DOCUMENTATION
Topic: Enterprise Structure
|
|
Name |
Target Completion Date |
Actual Completion Date |
Status O/I/C* |
|
Config. template prepared by |
|
28/01/2013 |
28/01/2013 |
C |
*Status: O – Outstanding, I – In Progress, C – Completed
I. Objective
- Set up Enterprise Structure
II. Configuration Template
Step 1.1: Define, copy, delete, check plant
Step 1.1 |
Goto t-code SPRO |
|
IMG Menu |
Enterprise Structure > Definition > Logistics - General > Define, copy, delete, check plant |
|
Prerequisite |
|






Copy the plant.



Step 1.2: Maintain storage location
Step 1.1 |
Goto t-code SPRO |
|
IMG Menu |
Enterprise Structure > Definition > Materials Management > Maintain storage location |
|
Prerequisite |
|


Set up this Storage locations by plant.


Step 1.3: Maintain purchasing organization
Step 1.1 |
Goto t-code SPRO |
|
IMG Menu |
Enterprise Structure > Definition > Materials Management > Maintain purchasing organization |
|
Prerequisite |
|



Step 1.4: Assign plant to company code
Step 1.1 |
Goto t-code SPRO |
|
IMG Menu |
Enterprise Structure > Assignment > Logistics - General > Assign plant to company code |
|
Prerequisite |
|



Step 1.5: Assign purchasing organization to plant
Step 1.1 |
Goto t-code SPRO |
|
IMG Menu |
Enterprise Structure > Assignment > Materials Management > Assign purchasing organization to plant |
|
Prerequisite |
|




本文档提供了企业架构配置的步骤说明,包括定义、复制、检查工厂,维护存储位置及采购组织等关键环节,并详细介绍了各步骤的操作路径及前置条件。
567

被折叠的 条评论
为什么被折叠?



