CONFIGURATION DOCUMENTATION
Topic:Shop Floor Control
|
Name |
Target Completion Date |
Actual Completion Date |
StatusO/I/C* |
Config. template prepared by |
|
14/01/2013 |
14/01/2013 |
C |
Knowledge transfer to |
|
|
|
|
Actual set up by |
|
14/01/2013 |
14/01/2013 |
C |
Reviewed by |
|
|
|
|
*Status: O – Outstanding, I – In Progress, C – Completed
Transport request no. |
|
Client Dependent/Independent |
Client Dependent |
I. Objective
- Set up Shop Floor Control (Production Orders)
II. Configuration Template
Step 1.1: Define Production Order Type
Step 1.1 |
Goto t-code OPJH |
IMG Menu |
Production > Shop Floor Control > Master Data > Order > Define Order Types |
Prerequisite |
|
PP11
PP12
PP13
Step 1.2: Define Order type-dependent parameters
Step 1.2 |
Goto t-code OPL8 |
IMG Menu |
Production > Shop Floor Control > Master Data > Order > Define order type-dependent parameters |
Prerequisite |
Plant defined, Production Order type defined |
Step 1.3: Define number range for orders
Step 1.3 |
Goto t-code CO82 |
IMG Menu |
Production > Shop Floor Control > Master Data > Order > Define number ranges for orders |
Prerequisite |
Order type defined |
Step 1.4: Define control key – Routing Data
Step 1.4 |
Goto t-code OPJ8 |
IMG Menu |
Production > Shop Floor Control > Master Data > Routing Data > Define control key |
Prerequisite |
|
Step 1.5: Define Task List Selection
Step 1.5 |
Goto t-code OPJF |
IMG Menu |
Production > Shop Floor Control > Operations > Task List Selection > Select Automatically |
Prerequisite |
|
Step 1.6: Define BOM Selection
Step 1.6 |
Goto t-code OPJF |
IMG Menu |
Production > Shop Floor Control > Operations > Bill of Material Selection > Define Priorities for BOM |
Prerequisite |
BOM Usage indicator defined |
Step 1.7: Define Application-Specific Criteria for Altern. Determination
Step 1.7 |
Goto t-code OPJM |
IMG Menu |
Production > Shop Floor Control > Operations > Bill of Material Selection > Define Applications |
Prerequisite |
|
Step 1.8: Define Alternative Determination for Production
Step 1.8 |
Goto t-code SPRO |
IMG Menu |
Production > Shop Floor Control > Operations > Bill of Material Selection > Define Alternative Determination for Production |
Prerequisite |
Plant defined, Application defined |
Step 1.9: Define Scheduling Parameters for Production Orders
Step 1.9 |
Goto t-code OPU3 |
IMG Menu |
Production > Shop Floor Control > Operations > Scheduling > Define Scheduling Parameters for Production Orders |
Prerequisite |
Plant defined, Production order type defined |
Step 2.0: Define Capacity Category
Step 2.0 |
Goto t-code SPRO |
IMG Menu |
Production > Shop Floor Control > Operations > Capacity Requirements Planning > Define Capacity Categories |
Prerequisite |
|
Step 2.1: Determine Capacity Planner
Step 2.1 |
Goto t-code SPRO |
IMG Menu |
Production > Shop Floor Control > Operations > Scheduling > Determine Capacity Planner |
Prerequisite |
|
Step 2.2: Define
Confirmation Parameters
Step 2.2 |
Goto t-code OPK4 |
IMG Menu |
Production > Shop Floor Control > Operations > Confirmation > Define Confirmation Parameters |
Prerequisite |
Plant defined, Production order type defined |