Project Management in R&D (P35) part 2

本文介绍SAP系统中网络类型的配置步骤,包括分配网络类型、定义检查控制、设置结算配置等,确保网络作为特殊形式的工作订单能正确管理和控制。

3.9 Maintain Network Types  (t-code  OPSC)

The network type contains information for controlling and managing networks. In the SAP System, the network is a special form of the work order, which has a structure in common with production, maintenance, and inspection orders. Every network you create must have a network type allocated to it.

image

image

Assign number range to the network type:

image image

The result:

image

 

3.10    Specify Parameters for Network Type  (t-code  OPUV)

image

image

 

3.11    Specify Parameters for Network Scheduling   (t-code  OPU6)

image

image

 

3.12    Define Checking Control

The purpose of this activity is to define the control for the availability check of materials, production resources/tools and capacities. Which check rule is to be used and whether a check is to be carried out, is specified depending on plant and network type and the business transaction, for example, whether the check is to take place when creating or releasing a network.

image

image    image

 

3.13    Define Confirmation Parameters   (t-code  OPST)

Completion confirmations are part of order monitoring. They document how far operations and sub-operations have been processed. The SAP System distinguishes between partial and final confirmations. The configurations for the confirmation are specified for each plant and network type.

image

image

 

3.14    Maintain Controlling Area   (t-code  OKKP)

In order to update CO-Files for posting transactions with additional account assignments to WBS elements and networks the component “Projects” in the controlling area settings needs to be activated.

image

Note: Controlling area 1000 is maintained in 3.8

image

image

 

3.15    Create Allocation Structure

During settlement, costs incurred under the primary and cost element by a sender are allocated to one or more receivers. When you settle by cost element, you settle using the appropriate original cost element.

image

image

go back to “create source structure”, add the assignment

image

now go back to “create allocation structure”

image

image

 

3.16    Define PA Transfer Structure   (t-code  KEI1)

The purpose of this activity is to assign the cost element groups to value fields in the profitability analysis.

image

image

image

image

 

3.17    Create Settlement Profile

The purpose of this activity is to copy the settlement profile into the settlement rule from the project profile. The Settlement profile is a requirement for creating a settlement rule.

In the settlement profile parameters are defined like allowed settlement receivers (such as cost center or asset) and default values for the settlement structure.

image

image

 

3.18    Specify Persons Responsible for WBS Elements   (t-code  OSP6)

image

image

 

3.19    Specify Applicants for WBS Elements   (t-code  OSP7)

image

转载于:https://www.cnblogs.com/lazymango520/archive/2010/12/11/1958762.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值