【第33题】2019年OCP认证12C题库062考试最新考试原题-33

33、choose four

Which four statements are true about the components of the Oracle Scheduler?

A) A program and schedule can be specified as part of a job definition.

B) A job may get started automatically when a window opens.

C) A scheduler job can point to a chain instead of pointing to a single program object.

D) A program and job can be specified as part of a schedule definition.

E) A job is specified as part of a program specification.

F) A schedule can be specified to a single job only.

G) A program can be used in the definition of multiple jobs.

Answer:ABCG

(解析:job包含schedule和program,到了时间,job能够自动运行,job可以是指向一个program 也可以指向一个job的链接。来自3组:1015267481)

转载于:https://www.cnblogs.com/cnblogs5359/p/10905392.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值