TFS – Explanation on Area & Iteration

TFS – Explanation on Area & Iteration<?xml:namespace prefix = o ns = "urn:schemas-microsoft-com:office:office" />

 

Area

An area represents a category used to group work. Many times this is referred to as a module or feature set. For example, a project may break down work by defining a user account profile module, an order entry module, an order history module, or an inventory module. These modules or areas are used to group tasks and other work items in the system. This capability is useful for reporting and tracking. Areas can also be defined in a hierarchical structure. This allows for the definition of subareas and the like.

 

Iterations

An iteration represents a time period on the project in which you will execute some portion of the work. The intent of an iteration is to time-box some set of work items that will be delivered in a specific window of time. You may define 30-day sprints, for example. In addition, iterations may overlap one another for various reasons. Typically, this is the result of a hand-off between team members or groups on the project.

 

For example, suppose you define four iterations for your project. Each iteration may be defined as a 30-day time-box. You would go through the full life cycle of development for a subset of functionality during each of these iterations. You might define two to four areas or modules to be developed during each iteration.

 

 

 

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值