Project Management in Research & Development (P55)

项目计划与调度
本文详细介绍了一个项目的创建过程,包括里程碑设定、活动安排、网络关系建立等步骤,并解释了如何进行项目调度、成本预算及结算规则设定等内容。

2.2 Create Project  CJ01

image

2.3    Creating Milestones for WBS elements   CJ20N

image

2.4    Creating a Network    CN21

image image

2.5    Creating Activities     CN22

image

image

2.6    Creating Milestones to a Network activity    CJ20N

image

2.7    Creating Relationships between Network activities    CJ20N

Double-click on the network RD-0001, Choose clip_image002  or press Shift+F7.

image

2.8    Scheduling the Project           CJ2B

image

Click on the Schedule icon. The system uses the project start and finish dates as the basis for calculating and displaying the earliest and latest dates for the activities.

image

Before scheduling                                                After scheduling

image image

image

image

The system copies the maximum dates (earliest start and latest finish) determined in scheduling for each activity and displays them as date bars in the WBS elements.

image

 

2.9    Planned Costs   CJ40

The cost plan relates to the overall project and not to individual years. If you want to plan your costs on a year-to-year base, select the respective year in Period pull-down menu and make the appropriate entries. Then choose Edit --> Total up and select the Total values checkbox and the Annual values checkbox.

image

2.10    Budget      CJ30

Optional: If you want to budget your project on a year-to-year base, select the respective year in Period pull-down menu. Choose Edit à Total up and select the Total values checkbox and the Annual values checkbox.

image

2.11    Release     CJ02

Before a project can be edited, it must be released. The release can either be granted for individual activities or elements, or the entire project can be released all at once.

image

After releasing the respective WBS Element(00000071), the activity in the network, which is connected with the released WBS Element, has to be released as well.

image  image

CN22

image

2.12    Confirmations   CN22

image

image

2.13    Storing the Settlement Rule – Networks    CN22

image

Receriver 000000071

Sender:  RD-0001

 image

2.14    Network Settlement         CJ88

image

2.15    Storing the settlement rule WBS Elements   CJ20N

image

Receiver:00000007

Sender:  000000071

image

image

Result
The cost accumulated in the WBS elements will be settled to the WBS element 00000007.  Then the cost at accumulated at such WBS element will be settled to the profitability segment at the CO-PA. 

 

2.16    Settlement of all Costs   CJ88

 

2.17    Evaluating the Project  CN41

image

转载于:https://www.cnblogs.com/lazymango520/archive/2010/12/14/1958761.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值