MRP4 -- Dependent requirements ind. for individual and coll. reqmts

本文详细解释了在材料需求计划(MRP)中,个体与集合需求指示符如何用于区分依赖材料的需求是独立的还是集中的。通过设置不同的指示符,可以控制计划过程中的库存管理、采购策略以及对销售订单的影响,特别是在自制库存(MTO)规划策略下,这种指示符对于控制依赖组件的需求计划至关重要。

摘要生成于 C知道 ,由 DeepSeek-R1 满血版支持, 前往体验 >

Dependent requirements ind. for individual and coll. reqmts

Indicator determining whether the following requirements are allowed for the dependent requirements of the material:

  • Individual requirements
  • Requirement quantities of the dependent material are stated individually.
  • Collective requirements
  • Requirement quantities of the dependent material are grouped together.

Use

You can maintain this indicator in the following places:

  • In the material master record
  • For the explosion type of the BOM item (in Customizing for Basic Data in Define Explosion Types)

The setting for the explosion type overrides that in the material master record.

Dependencies

If the material is assigned to a material type that does not allow quantity-based inventory management(KMAT type) in this plant, you can set the indicator to individual requirements only.

If the stock is to be managed in sales order stock or project stock, the indicator must be set to one of the following options:

  • Individual and collective requirements
  • Individual requirements only

If a material managed in project stock is to be procured from another plant using a cross-company-code stock transport order, the indicator must be set to 2 (collective requirements) in the issuing plant because, in this specific context, individual project stock management is not possible in both plants.

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

If you set Individual indicator for both header material and dependent material,   then if sale order comes for 1000 qty, then During MRP run system will create a plan order with reference to sale order and for dependent material, system will plan dependent material as sale order relevant. System won't consider warehouse stock for that sale order.

 

In your Case, you can set Individual/collective indicator as 1 for dependent components not for Header material. Mostly this can be used for make to order scenario.

If you set the Individual/collective indicator as 1 for the Header material, during MRP run system will not consider the existing warehouse stocks for the Sales order, MRP will create Planned order against of Sales order.

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

indicator = "1 " --- Mostly for KMAT material (KMAT type) and make-to-order scenario .

indicator = "2" ----

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

What is the relevance of individual/Collective Requirement indicator from MRP4 view of material for Finished product as well as its sub assemblies in case of make to Stock planning strategies.
 
Answer:
 
Individual & collective indicator plays a major role in MRP.
 
If you set Individual indicator for both header material and dependent material, then if sale order comes for 100 qty, then During MRP run system will create a planned order with reference to sale order and for dependent material, system will plan dependent material as sales order relevant. System won't consider warehouse stock for that sale order.
 

If you set collective indicator for dependent material system will consider warehouse stock for dependent material.
 
MRP-4 as 1 : In individual planning, this indicator is used to display the dependent requirements of a component separately.
 
MRP-4 as 2 : In collective requirements, this indicator is used to display the dependent requirements of a component grouped together.
 
This Indicator is useful to control the planning of dependent requirements if the main product is being planned with strategy 20 i.e.; MTO Process.
 
 
MARC-SBDKZ indicator controls whether individual or collective customer requirements planning is allowed for dependent requirements means low level in BOM.
 
If you define individual requirements for explosion, dependent requirements for a component are shown individually on the superior low-level code.
 
If you define collective requirements for explosion, required quantities for the material are summarized independently of the sales order.
 
In the MTO scenario, if you want to check the unrestricted raw material stock when you run the MRP for sales order.  Please check by selecting individual/collective requirement as 2.
 
Please note:
 
- If you select individual requirement then system will not consider available stock and generate Proposals for every single requirements.  Also you will find PR and Plan order with account assignment of Sales order (in case of MD50).
 
- If you select collective requirement then system will not generate planning proposals through MD50.  In that case you have to go for individual MRP (MD02 / MD03 / MD41 / MD42).
 
For FG stock you can assign to sales order through MB1B by 412 E movement type.

 

转载于:https://www.cnblogs.com/jefflu2012/p/4382443.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值