A New Gyratory Crusher Recommended to You One

里奥英矿业在西澳大利亚皮尔巴拉地区拥有多个大型铁矿开采点,包括Mount Tom Price、Marandoo、Brockman、Paraburdoo和Yandicoogina等,总产量达到97.2百万吨铁矿石。其中,Paraburdoo、Mount Tom Price、Marandoo、Brockman和Yandicoogina为主要来源地,总产出79.2百万吨。东部范围运营产出8.2百万吨,Channar合资企业产出9.8百万吨。2006年公司港口总发货量创历史新高,达到98.1百万吨。

The Hamersley Basin mining location lies in the Pilbara region of north-west Western Australia, 1,100km north of Perth. By means of its wholly owned subsidiary, Hamersley Iron Pty, Rio Tinto operates five major creating mines in this area: Mount Tom Cost, Marandoo, Brockman, Paraburdoo and Yandicoogina, though the business is in a 60/40% joint venture using the Chinese corporation, CMIEC, at the Channar mine and with Henan Baosteel at Eastern Ranges. The Yandicoogina mine came on stream in 1999.

Production for the duration of 2006 totalled 97.2Mt of iron ore , of which 79.2Mt was sourced from Paraburdoo, Mount Tom Price, Marandoo, Brockman and Yandicoogina, 8.2Mt came from the Eastern Range operation, and 9.8Mt came from the Channar joint venture.

Total shipments from the company’s ports were 98.1Mt, an all-time record, driven largely by additional increases in demand for iron ore from China. Rio Tinto also has a 53% holding inside the Robe River iron ore properties (Pannawonica and West Angelas), also in the Pilbara, which created a further 52.9Mt of ore during 2006.

In early 2008 Rio Tinto additional strengthened its top position in the region using the discovery of a major, new resource at Caliwingina (875Mt at 56.9% Fe).

The Caliwingina resource is within the Mt Pyrton Project region which lies 100km northwest of Tom Price. It can be situated within the Late Archaean to Early Proterozoic (two,765–2,470Ma) Hamersley Basin.

Geology and reserves

The Hamersley iron resources, contained in banded iron formations of precambrian age, cover extensive areas with the Pilbara region. Haematite would be the principal iron mineral.

In the very first quarter of 2010 confirmed and probable reserves at Hamersley’s Pilbara operations yielded 3,344Mt of saleable ore. The Robe River operations had a additional 696Mt of confirmed and probable ore, grading between 57.2% and 62.2% iron. Rio Tinto also has substantial undeveloped resources in the Pilbara, too as a 50% interest within the Hope Downs joint venture that was completed in 2008.

Mining

All of Hamersley Iron’s mines are standard open pits. Material is drilled and blasted in benches, blast holes becoming charged with an ammonium nitrate/fuel oil (ANFO) mixture and heavy ANFO dispensed by bulk explosive trucks. Ore is loaded into haul trucks by shovels, hydraulic excavators or front-end-loaders, and transported towards the primary crusher. It really is then processed in a crushing and screening plant to generate fine ore and lump ore.

At Marandoo, 4 pits are operational and others are going to be brought into operation inside the future.

The low bench height (10m), compared with Mount Tom Cost (15m) and Paraburdoo (14m), facilitates selective mining and minimises dilution, but equipment is smaller than at Hamersley’s other operations.

Brockman enhances the stability and flexibility of Hamersley operations and raises the proportion of lump in Hamersley’s item mix. It’s a contractor operation with management and grade control coming under Hamersley’s direction. The deposit consists of detrital and conglomerate haematite.

At Channar, crusher feed comes from Channar Primary Pit and Channar East, with Paraburdoo’s contribution to total production getting been reduced accordingly to retain continuous output as Channar’s has built up to more than 10Mt/y.

As the professional manufacturer of complete sets of mining machinery, such as rotary kiln,rotary kiln, Vibrating grizzly feeder,China mobile crusher, Henan Hongxing is always doing the best in products and service.

转载于:https://www.cnblogs.com/liajones/archive/2012/02/18/2357088.html

AI-PPT 一键生成 PPT:用户输入主题关键词,AI-PPT 可快速生成完整 PPT,涵盖标题、正文、段落结构等,还支持对话式生成,用户可在 AI 交互窗口边查看边修改。 文档导入转 PPT:支持导入 Word、Excel、PDF 等多种格式文档,自动解析文档结构,将其转换为结构清晰、排版规范的 PPT,有保持原文和智能优化两种模式。 AI-PPT 对话 实时问答:用户上传 PPT 或 PPTX 文件后,可针对演示内容进行提问,AI 实时提供解答,帮助用户快速理解内容。 多角度内容分析:对 PPT 内容进行多角度分析,提供全面视野,帮助用户更好地把握内容结构和重点。 多语言对话支持:支持多语言对话,打破语言障碍,方便不同语言背景的用户使用。 AI - 绘图 文生图:用户输入文字描述,即可生成符合语义的不同风格图像,如油画、水彩、中国画等,支持中英文双语输入。 图生图:用户上传图片并输入描述,AI - 绘图能够根据参考图和描述生成新的风格化图像,适用于需要特定风格或元素的创作需求。 图像编辑:提供如 AI 超清、AI 扩图、AI 无痕消除等功能,用户可以上传图片进行细节修改和优化,提升图片质量。 AI - 文稿 文案生成:能够根据用户需求生成多种类型的文章,如市场营销文案、技术文档、内部沟通内容等,提升文案质量和创作效率。 文章润色:对已有文章进行改善和优化,包括语言表达、逻辑连贯性、内容流畅度等方面,使文章更符合用户期望和风格。 文章续写:AI 技术理解文本语境,为用户提供新的想法、补充资料或更深层次的见解,帮助用户丰富文档内容。 AI - 医生 智能健康咨询:包括症状自查,用户输入不适症状,AI 结合病史等信息提供疾病可能性分析与初步建议;用药指导,支持查询药品适应症、禁忌症等,并预警潜在冲突;中医辨证,提供体质辨识与调理建议。 医学报告解读:用户上传体检报告
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值