1、SQA Group

a group of software professihe onals whose size depends on the size of the development team;must report to QA manager not development manager;their primary resonsibility is not testing.

The SQA group works with the software project during its early stages to establish plans, standards, and procedures that will add value to the software project and satisfy the project constraints and the organization’s policies.

The SQA group reviews project tasks and audits software work products throughout the SDLC lifecycle and provides management with visibility as to whether the software project is adhering to its established objectives and standards.

2、High-Level Tasks Performed for SQA

1). An SQA plan is prepared…

2). The SQA group’s activities are performed in accordance with the SQA plan.

3). The SQA group participates in the preparation and review of the project’s software development plan, standards, and procedures. 

4). The SQA group reviews the software engineering activities to verify compliance.

5).The SQA group audits designated application development project’ work products to verify compliance.

6). The SQA group periodically reports the results of its activities to the software engineering group.

7). Deviations identified in the software activities and software wok products are documented and handled according to a documented procedure. 

8. The SQA group conducts periodic reviews of its activities and findings with the customer’s SQA personnel, as appropriate

 

3、Problems Facing the SQA Group

Viewed as spies to management

Viewed as not having enough technical background, know nothing about the mechanics of building software.

Blame developers for poor quality but provide no solution

Insensitive to intelligent and talented developers and system engineers.

 

4、Software Quality Assurance Plan

The Software Quality Assurance plan provides the framework and guidelines for development of high quality software.

The SQA plan is developed by the SQA group, and serves as a template for SQA activities.

A standard for SQA plans has been recommended by the IEEE.

 

5、Develop and implement a SQA Plan

Step 1. Document the Plan

1) Purpose section

2) Reference document section

3) Management section

4) Document section

5) Standards practices conventions and metrics section

6) Reviews and inspectionssection

7) SCM section

8) Problem reporting and correction action section

 9) Tools, techniques, and methodologies section

10) Code control section

 11) Media control section

12) Supplier control section

13) Records collection,maintenance, and retention section

14) Testing methodology


Step 2. Obtain Management Acceptance

Management is responsible bother for ensuring the quality of a software project and for providing the resources needed for software development.

 If the scope of a project spans organizational boundaries, approval should be obtained from all affected areas.

In general, implementing a formal SQA plan makes economic and management sense.


Step 3. Obtain Development Acceptance

Since the software developers are the primary users of an SQA plan, their approval and cooperation in implementing the plan are essential.

 The software project team members must adhere to the project SQA plan; everyone must accept it and follow it. 

No SQA plan is successfully implemented without the involvement of the software team members and their managers in the development of the plan.


Step 4. Plan for Implementation of the SQA plan

The process of planning, formulating, and drafting an SQA plan requires staff and word processing resources. The individual responsible for implementing an SQA plan must have access to these resource.

A schedule for drafting, reviewing, and approving the SQA plan should be developed.


Step 5. Execute the SQA Plan

The actual process of executing an SQA plan by the software development and maintenance team involves determining necessary audit points for monitoring it.

Audit points should occur either periodically during development or at specific project milestones (e.g., at major reviews or when part of the project is delivered).

 

转载于:https://www.cnblogs.com/huhaibo/p/3409699.html

内容概要:该论文聚焦于T2WI核磁共振图像超分辨率问题,提出了一种利用T1WI模态作为辅助信息的跨模态解决方案。其主要贡献包括:提出基于高频信息约束的网络框架,通过主干特征提取分支和高频结构先验建模分支结合Transformer模块和注意力机制有效重建高频细节;设计渐进式特征匹配融合框架,采用多阶段相似特征匹配算法提高匹配鲁棒性;引入模型量化技术降低推理资源需求。实验结果表明,该方法不仅提高了超分辨率性能,还保持了图像质量。 适合人群:从事医学图像处理、计算机视觉领域的研究人员和工程师,尤其是对核磁共振图像超分辨率感兴趣的学者和技术开发者。 使用场景及目标:①适用于需要提升T2WI核磁共振图像分辨率的应用场景;②目标是通过跨模态信息融合提高图像质量,解决传统单模态方法难以克服的高频细节丢失问题;③为临床诊断提供更高质量的影像资料,帮助医生更准确地识别病灶。 其他说明:论文不仅提供了详细的网络架构设计与实现代码,还深入探讨了跨模态噪声的本质、高频信息约束的实现方式以及渐进式特征匹配的具体过程。此外,作者还对模型进行了量化处理,使得该方法可以在资源受限环境下高效运行。阅读时应重点关注论文中提到的技术创新点及其背后的原理,理解如何通过跨模态信息融合提升图像重建效果。
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值