1.Decide on a high-level project timeline. When will the project start and when do you estimateit will end?

2.Break down the requirements into specific tasks.

3.Estimate the amount of time each of those tasks will take.

4.Determine which resources will be working on each task. Will certain tasks require specializedskills? If so, be sure to account for the availability of someone with those skills.

5.To the extent possible, determine any roadblocks or risks you might face, and attempt totroubleshoot them proactively.

6.Allow enough time to include all phases of traditional development, including any necessary extra planning, building the branding and the SharePoint site, testing and review, making any necessary adjustments, and deploying the project to a production environment.

 

SharePoint projects have specific factors that could impact project estimation. The following is a list of some things that should be considered:

➤Will the project involve creating custom master pages, or will it just use a SharePoint theme?

➤What is the skill level of the designers and developers involved in the project? Do they have experience with SharePoint?

➤How will the project be deployed to a production server? Will files just be customized with SharePoint Designer, or will a solution package be created?

➤How complex is the design that is being attempted?

➤How many different areas of SharePoint will be branded?

➤How many Web Parts will need custom styling?

➤How flexible is the due date and budget?

转载于:https://www.cnblogs.com/nero/archive/2012/11/15/2771721.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值