Diagnosis

The system could not calculate a price for the internal activity with activity type of cost center because none of the valuation strategies in valuation variant was successful.

System Response

  • If the system issues a warning message or an information message, the costing item will be used in costing with a value of zero.
  • If the system issues an error message, it sets the status "KF" (costed with errors).
  • If the system issues a termination message, the cost estimate cannot be processed.

Procedure

  1. Check the master data for activity type of cost center .
  2. If you have authorization for Customizing, check the valuation strategy for internal activities in valuation variant .

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

Solution:

T-Code KP26, maintain the fixed prize for the combination of the activity type and cost centre only the solution.

Check in transaction OIOF for the planned and actual costing variants for your order type.
Check in transaction OKP6 for the valuation variant being used by the costing variant.
Transaction OKP8.
Click on icon to make the transaction display instead of change.
Use menu path: Utilities > Comparison to ensure the settings have not been changed from the SAP supplied settings(this is usually comparison with client 000)
If the settings have been changed, you should not change back to standard, as it is probably also used by PP.
Point this out to FI/CO and request a Znn Valuation Variant for use by PM/CS.
Assign to your order type as above.

转载于:https://www.cnblogs.com/jefflu2012/p/3500314.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值