BFF5250 Corporate Treasury ManagementSQL

Java Python Group Assignment Project

BFF5250 Corporate Treasury Management

Group Q

Genesis Energy, L.P. (GEL)

Introduction

The company is considering investing in a wind energy project in a foreign country. The wind energy investment project consists of two phases.

Phase-1 investment involves building an onshore wind farm with a capacity of 500 MW.

The onshore wind farm requires a project development and maturation stage including geographic studies and necessary permit applications in year 0, and additional geographic studies, such as bird collision studies, in years 1-5. In year 0, the onshore wind farm is constructed, turbines purchased, and the power grid connected. The onshore wind farm's fixed assets are depreciated using a straight-line method over the 15-year wind-farm life. There might be a salvage value at the end of year 15. From year 1, the onshore wind farm is expected to operate and generate electricity. Besides, the operation requires an initial investment in net working capital in year 0 that amounts to a fixed rate of year 1's expected gross profit. The required investment in NWC can be fully recovered at the end of the operation (year 15).

After five years of experience in Phase 1, the management considers an expansionary Phase 2 investment—adding to the onshore wind farm capacity additional 750 MW. No additional project development and maturation stage is required. Phase 2 involves capital expenditures in year 5, like farm construction and connection and purchasing turbines. The expanded part of the wind farm has 15 years of operation. At the end of year 20, there may be a salvage value. The onshore wind farm expansion's fixed assets are depreciated using a straight-line method over 15 years. Like Phase-1, the operation requires an initial investment in net working capital up to a fixed rate of the expected year-1 gross profit, which can be fully recovered at year 20.

The market team has identified that the electricity price is a significant risk factor. Although the wind farm's capacity can be fixed due to the business volatility, the future gross profits are uncertain.

See the next section for more details.

Project Details

Country

Ukraine

Business risk volatility

65%

Phase 1 wind farm details (life: 15 years)

Expected cost or revenues

U.S. $ million / year

Year(s)

Project development and maturation costs

35

0

Turbines & wind farm construction

(Q: 3.1)

 

Expected annual gross profit

(Q: 3.1)

 

Salvage Value

(Q: 3.2)

 

Bird collision studies

10

1-5

Operations and maintenance costs / gross profit

15%

1-15

NWC/expected gross profit in year 1

10%

0

* < BFF5250 Corporate Treasury ManagementSQL i>Students are required to estimate the relevant figures for Phase – 2 analysis

Tasks

3.1 Estimating Project Costs and Revenues

Provide an estimate for the capital expenditure of constructing a wind farm of this size and the gross profits it is expected to generate. Conduct the analysis to both Phase 1 and Phase 2. Support your estimates by researching competitors in this field with references to the sources.

3.2 Estimating the Salvage Value

Provide an estimate for the salvage value for a windfarm of this size. Conduct the analysis to both Phase 1 and Phase 2. Support your estimates by researching competitors in this field with references to the sources.

3.3 Free cash flow analysis

Using data from the EDGAR Annual report and Annual Information filings for the company, calculate and analyze the current (the most recent financial year) free cash flow to the firm and equity. State the group's assumptions and data sources for the free cash flow analysis inputs. Present a short discussion regarding the inputs the group eventually chooses.

3.4 Capital structure analysis

Analyze the company's capital structure, including an overview of its financial instruments for funding purposes.

Calculate the current post-tax WACC for the company. The group needs to estimate the market value of debt and equity, the risk-free rate, the market risk premium, the company beta, and the costs of debt and equity for the WACC calculation.

For all inputs to the WACC calculation, the report must state the assumptions and sources of data. Present a short discussion regarding the inputs the group eventually chooses.

3.5 A project discount rate

The group should derive the project cost of capital, reflecting the business and country-specific risks. The report must state the assumptions and sources of data. Present a discussion regarding the cost of capital and its derivation. 

3.6 Estimate FCFs and calculate NPVs

Calculate the project FCF and estimate Phase-1 and Phase-2 NPVs.

The report must state the assumptions and sources of data. Present a discussion regarding the outcomes and whether the company should invest in the project and expand it.

3.7 Risk Analysis and Business Strategy

A significant investment in a foreign country involves dealing with risks and costs that the management team needs to learn and adapt to overtime. Identify significant risk factors that may substantially impact the outcome of the investment project.

Identify the expected, best and worst case scenarios, and conduct an analysis of the most important ingredients affecting the NPV and the decision whether to invest in wind farm and whether to expand (e.g., break-even, sensitivity, or scenario analysis).

Discuss and provide evidence of the company's business strategy. Answer whether this project is compatible with its business strategy and risk appetite. Discuss the project's impact on the company's risk profile.

3.8 Decision Tree Analysis of Phase-2

The management team has the option to expand Phase-1 in year 5. The valuation of Phase-2 reflects the added value of this call option.

Construct the binomial tree for the path of gross profits as illustrated in the graph below. Assume that the annual gross profits are equally likely to increase or decrease by σ (business risk volatility) relative to the previous year's level. After 5 years, gross profits do not change.

 

Based on the estimates you derived in (3.1) for the expected gross profits, construct the decision tree and value the Phase-2 investment using the decision tree analysis. The report should include

1. An explanation for the rationale of this approach;

2. Discussion of the parameters' values in the formulas;

3. A Drawing of the decision tree with sufficient information;

4. An explanation of the optimal strategy;

5. The calculation and final results;

6. Discuss the real-option valuation versus the DCF approach results.

3.9 Black-Scholes Analysis of Phase 2

Use the Black-Scholes formula to calculate the value of Phase-2. The report should include

1. An explanation for the rationale of this approach;

2. Discussion of the parameters' values in the formulas;

3. The calculation and final results;

4. A Discussion and comparison of the previous results (decision-tree results and DCF results).

The given business risk volatility (σ) is also the standard deviation of returns.

3.10  Recommendations

Based on the company's analysis, its strategic focus, growth strategy, and project analysis, make recommendations to the CEO. The group's recommendation should discuss the return on equity, free cash flow to the firm and equity, the funding of the firm's capital structure, and its cost of capital. The recommendation should be based on the analysis and throughouts conveyed in the report         

【四旋翼无人机】具备螺旋桨倾斜机构的全驱动四旋翼无人机:建模与控制研究(Matlab代码、Simulink仿真实现)内容概要:本文围绕具备螺旋桨倾斜机构的全驱动四旋翼无人机展开研究,重点探讨其系统建模与控制策略,结合Matlab代码与Simulink仿真实现。文章详细分析了无人机的动力学模型,特别是引入螺旋桨倾斜机构后带来的全驱动特性,使其在姿态与位置控制上具备更强的机动性与自由度。研究涵盖了非线性系统建模、控制器设计(如PID、MPC、非线性控制等)、仿真验证及动态响应分析,旨在提升无人机在复杂环境下的稳定性和控制精度。同时,文中提供的Matlab/Simulink资源便于读者复现实验并进一步优化控制算法。; 适合人群:具备一定控制理论基础和Matlab/Simulink仿真经验的研究生、科研人员及无人机控制系统开发工程师,尤其适合从事飞行器建模与先进控制算法研究的专业人员。; 使用场景及目标:①用于全驱动四旋翼无人机的动力学建模与仿真平台搭建;②研究先进控制算法(如模型预测控制、非线性控制)在无人机系统中的应用;③支持科研论文复现、课程设计或毕业课题开发,推动无人机高机动控制技术的研究进展。; 阅读建议:建议读者结合文档提供的Matlab代码与Simulink模型,逐步实现建模与控制算法,重点关注坐标系定义、力矩分配逻辑及控制闭环的设计细节,同时可通过修改参数和添加扰动来验证系统的鲁棒性与适应性。
评论 1
成就一亿技术人!
拼手气红包6.0元
还能输入1000个字符
 
红包 添加红包
表情包 插入表情
 条评论被折叠 查看
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值