Transfer Control

本文介绍了转移控制在部分成本核算中的作用及其定制过程。转移控制用于定义参数以避免在已有成本数据的情况下创建新的成本估算,而是将现有数据转移到新估算中,以此提高效率。

摘要生成于 C知道 ,由 DeepSeek-R1 满血版支持, 前往体验 >

 

 1. Purpose of transfer control

Transfer control - Transfer control is used to define parameters for partial costing. The purpose of partial costing is to prevent the system from creating a new cost estimate for a material when costing data already exists. Instead, the existing costing data is simply transferred into the new cost estimate. This improves performance.

 

2. Customization

Menu path:

 

1. Define transfer control

 

 

2) Assign transfer to costing variant

In customizing of costing variant, you can select a transfer control (OKKN), or you can leave it blank.

 

3) Determine if transfer control can be changed by user

 

 

 

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值