CONS6201 – MEASUREMENT & ESTIMATION 1Matlab

Java Python CONS6201 – MEASUREMENT & ESTIMATION 1

ASSIGNMENT NO. 1 – PREPARING AND PRICING SCHEDULE OF QUANTITIES

Due date: 13th August 2024 by 23:59

Individual assessment worth 35% of your overall grades

Objective

1.   To assess student’s ability to take information from design documentation and

prepare a Schedule of Quantities (SOQ) for specific trades, using the principles of

Australian and New Zealand standard method of measurement of building works 2022 Edition.

2.   To assess student’s ability to price the SOQ through unit rate estimating (URE) method.

Learning outcomes assessed:

No.2 - Derive schedule of quantities for simple work packages in accordance with a standard method of measurement.

No. 3 – Derive estimates of cost for simple work packages using unit rate techniques.

Task 1

You are employed  by a Professional  Quantity Surveying  practice and your company  needs to prepare a SOQ for the proposed Unitec Building 183(U8) Extension project, which is about to go out to tender. The SOQ will be issued to selected tenderers as part of the tender documentation. You have been asked to prepare the SOQ for the following three trades:

1.   Concrete

2.   Formwork

3.   Groundwork

Scope of work

•    Measure all the groundwork, concrete work, Formwork below Level 2 RL 106.585 – refer to the structural drawings provided.

•   Assume the site is flat.

•   50mm site concrete is required under all pad foundations.

•    150mm thick topsoil need to be remove and stockpile on site as directed by the engineer, for reuse in landscaping.

Task 2

You are employed by a Main Contractor to price the SOQ for the above trades for the Unitec Building 183(U8) Extension project tender.

a.   Price all the items prepared under Part 1 above, by using Unit Rate Estimating (URE) - CCWFeL formula.

b.   Show all your workings.

c.   Complete the SOQ for the three trades and show the total cost for each trade section, to be carried over to the tender summary of the Main contractor.

Other assignment documentation

• The Assignment Cover Sheet

•  pSoft Excel Template

•  The proposed Unitec Building 183(U8) Extension project drawings.

Mode of Submission

•   Complete and attached the Assignment Cover sheet.

•    Upload soft copy to Moodle dropbox before or on 13th August 2024, 23:59 Put A1-CONS6201y24-Student Name-Student ID. in subject line.

Please Note: Submit the softcopy assignment in Excel format (Psoft); not a PDF file.

Late Assignment

•   The submission will be regarded as a late assignment after 23:59, 13th  August 2024.

•    Late assignments (without AC approval) will incur a penalty of 10% per calendar day, for up to 5 days late.

•    Late assignments (without APC approval) more than 5 days after the due date will not be marked. Late submissions are not eligible for resubmission.

• Computer related problems/work commitments do not warrant an extension.

Marking Schedule

S/N

Task 1: Measuring - 60 Marks

Marks per trade

Concrete

Formwork

Groundwork

Student Marks

1

Well stated Main Preambles, Sub Preambles and appropriate Headings included.

3

2

Clear, detailed, and correct descriptions, well organised, sizes included where required.

4

3

Clear, detailed, and correct side

notes/calculations that allows the

measurements to be followed easily.

6

4

Correct and well booked measurements -- Dimensions in the correct order (L x W x H)

2

5

Accurate quantities

3

6

Correct unit of measurement used for items

2

Task 2: Unit Rate Estimating – 30 Marks

1

Provided realistic rates using the CCWFeL formula

6

2

Correct application of Labour rates and Labour constants.

2

3

SOQ totals correctly calculated

2

Overall Presentation – 10 Marks

Overall Marks

1

Spreadsheet well presented in a clear and legible format

2

2

All sections clearly visible with consistent use of headings and sub-headings

2

3

All items numbered in a logical manner

2

4

Reasonable Assumptions/RFI - Minimum of 3 assumptions well stated for each trade         

基于粒子群优化算法的配电网光伏储能双层优化配置模型[IEEE33节点](选址定容)(Matlab代码实现)内容概要:本文介绍了基于粒子群优化算法(PSO)的配电网光伏储能双层优化配置模型,针对IEEE33节点系统进行光伏与储能系统的选址定容优化。该模型采用双层优化结构,上层以投资成本、运行成本和网络损耗最小为目标,优化光伏和储能的配置位置与容量;下层通过潮流计算验证系统约束,确保电压、容量等满足运行要求。通过Matlab编程实现算法仿真,利用粒子群算法的全局寻优能力求解复杂非线性优化问题,提升配电网对可再生能源的接纳能力,同时降低系统综合成本。文中还提供了完整的代码实现方案,便于复现与进一步研究。; 适合人群:具备电力系统基础知识和Matlab编程能力的研究生、科研人员及从事新能源规划的工程技术人员;熟悉优化算法与配电网运行分析的专业人士。; 使用场景及目标:①用于分布式光伏与储能系统的规划配置研究,支持科研项目与实际工程设计;②掌握双层优化建模方法与粒子群算法在电力系统中的应用;③实现IEEE33节点系统的仿真验证,提升对配电网优化调度的理解与实践能力。; 阅读建议:建议结合Matlab代码逐步理解模型构建过程,重点关注目标函数设计、约束条件处理及上下层交互逻辑,同时可扩展至其他智能算法对比实验,深化对优化配置问题的认知。
评论
成就一亿技术人!
拼手气红包6.0元
还能输入1000个字符
 
红包 添加红包
表情包 插入表情
 条评论被折叠 查看
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值