Abnormal termination, caused by mdrv process termination
- The Host machine ( Load generator) is running too many Vusers as a result of which it system resources are being maximized. ( i.e. Consistent over 90% CPU and Memory utilization). The mdrv process does not get enough resources to process the request as a result it fails
- If you have Custom C coding, there is a possibility of allocated memory not being freed or memory violation errors which can lead to 'mdrv process termination'.
- Replay the script with think time.
- Turn off extended log when running the script in the controller.
- Do not use the controller itself as the loadgenerator. i.e. have a remote LoadGenerator.
- Introduce iteration pacing, if running more than one iteration each vuser.
- Open the file C:/WinNT/wlrun7.ini in a text editor, modify the entry from: AgentMaxThreadsPerDriver=50 to AgentMaxThreadsPerDriver=20 or 10
- Run Agent as process instead of service Launch command prompt and navigate to C:/Program Files/Mercury/Loadrunner/Launch_service/bin and run the command magentserive -remove. This will remove the agent. Now run the command magentproc -install This will install the agent as a process.
- Run vusers as process instead of threads.Please go to Runtime Settings > Miscellaneous > Multithreading > RunVuser as a process.
3442



被折叠的 条评论
为什么被折叠?



