CO

CO-CCA Maintain Controlling Area/Activate components/Assignment of company code OKKP
 Maintain number range for CO Document KANK
 Maintain Versions/Controlling area settings/Settings by fiscal year: Overview (SPRO)
 Change Message Control OBA5
 Automatic Creation of Primary and Secondary Cost Elements 
 Make default settings OKB2
 Create Batch Input Session OKB3
 Excute Batch Input Session SM35
 Specify Document Number Range for Reconciliation OK13
 Define Number ranges for Funds Commitment OK60
 Create Cost Center Standard Hierarchy OKEON
 Define cost center catergories SPRO
 Create Profit Center (Do 0KE5 first) KE51
 Create Cost Center KS01
 Create planning layouts for cost element planning KP65
 Define user-defined planner profiles/ Layouts for Controlling 
 Edit Default Account Assignment OKB9
 Define Own Screen Variants For Postings in Controlling 
  
Internal Order Define Budget Profile OKOB
 Define Order Types KOT2_OPA
 Define tolerance limits for availability control SPRO
 Maintain Field Status Variant SPRO
  
CO-PC Define Origin Group OKZ1
 Define Cost Component Structure OKTZ
 1. Cost Component With Attribute OKTZ
 2. Assignment Cost Component -Cost Element Interval OKTZ
 3. Cost component view OKTZ
 4. Assignment Organization Units- Cost Component Structure OKTZ
 Define Costing Types OKKN
 Define Valuation Variants OKKI
 Define Date Control OKK4
 Define Quantity Structure Control OKK6
 Define Costing Variants OKK5
  
 Check Material Status OMS2
 Basic Settings for Product Cost by Order 
 1.Check Costing Variants for Manufacturing Orders (PP) OPL1
 2.Check Valuation Variants for Manufacturing Orders (PP) OPN2
 3.Check Costing Variants for CO production Orders (PP) OKY2
 4.Check Valuation Variants for Manufacturing Orders (PP) OKY5
 5.Check Order Type KOT2
 6.Define Cost-Accounting-Relevant Default Values for Order Types and Plants 
 Defined Goods Valuation for Order Delivery 
 Period-End Closing 
 Work In Process 
 1.Define Results Analysis Keys OKG1
 2.Define Costs Elements for WIP calculation KA06
 3.Define Results Analysis Versions OKG9
 4.Define Valuation Method (Actual Costs)  OKGC
 5.Define Line IDs 
 6.Define Assignment OKGB
 7.Define Update OKGA
 8.Define Posting Rules for Settling Work in Process OKG8
 9.Define Number Ranges for Work in Process OKG6
 Variance calculation 
 1.Define Variance Key OKV1
 2.Define Default Variance Keys for plants. OKVW
 3.Check Variance Variants OKVG
 4.Define Valuation Variant for WIP and Scrap (Target costs) 
 5.Define Target Cost Versions OKV6
 6.Define Number Ranges for Variance Documents KANK

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/14397246/viewspace-666255/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/14397246/viewspace-666255/

基于粒子群优化算法的p-Hub选址优化(Matlab代码实现)内容概要:本文介绍了基于粒子群优化算法(PSO)的p-Hub选址优化问题的研究与实现,重点利用Matlab进行算法编程和仿真。p-Hub选址是物流与交通网络中的关键问题,旨在通过确定最优的枢纽节点位置和非枢纽节点的分配方式,最小化网络总成本。文章详细阐述了粒子群算法的基本原理及其在解决组合优化问题中的适应性改进,结合p-Hub中转网络的特点构建数学模型,并通过Matlab代码实现算法流程,包括初始化、适应度计算、粒子更新与收敛判断等环节。同时可能涉及对算法参数设置、收敛性能及不同规模案例的仿真结果分析,以验证方法的有效性和鲁棒性。; 适合人群:具备一定Matlab编程基础和优化算法理论知识的高校研究生、科研人员及从事物流网络规划、交通系统设计等相关领域的工程技术人员。; 使用场景及目标:①解决物流、航空、通信等网络中的枢纽选址与路径优化问题;②学习并掌握粒子群算法在复杂组合优化问题中的建模与实现方法;③为相关科研项目或实际工程应用提供算法支持与代码参考。; 阅读建议:建议读者结合Matlab代码逐段理解算法实现逻辑,重点关注目标函数建模、粒子编码方式及约束处理策略,并尝试调整参数或拓展模型以加深对算法性能的理解。
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值