SAP MM for test2

本文提供了一套 SAP Material Management (MM) 模块的知识测试题及答案解析,旨在帮助读者检验自己对于 SAP MM 模块的理解程度。题目涵盖了采购订单、库存管理、发票验证等多个方面。

Note that the SAP certification questions are not TRUE/FALSE type but multiple choice. This selection of questions is simply to test your knowledge of SAP.

Questions (TRUE or FALSE)
(Answers at end of this post)

1. Invoices can be released on item and header level?

2. On a Purchase Order with more than one line item, the different items can have prices (Gross price condition) that are on DIFFERENT currencies?

3. Public holidays are specified in the Factory calendar that are link to a specific Purchase Organization?

4. A “Material number template” can be set per MATERIAL TYPE?

5. The Quantity & Value update in the material type configuration can be set per Plant?

6. Number ranges for Vendor Masters (set at Account Group) must be either Internal or External – it can not be both?

7. Screen Sequence (which identifies the screen sequence for the display of the header details in the evaluation of the planning run) is set on lot size?

8. Purchase Organization + Purchasing Groups = Purchasing Area?

9. The validity period (start / end) can be entered in a Purchase Order and Purchase Requisition on header level?

10. Transaction “Create PO, Vendor unknown” can be used to create Purchase Orders and Purchase Requisitions?

11. With availability check – the current unrestricted stock can not be excluded from the calculation?

12. “Regular Vendor” (used in Info Records) is activated per Purchase Organization?

13. “Freezing of Book inventory” as used in Physical Inventory is only allowed if activated on Plant / S.Loc level?

14. If the posting Block was set for Physical Inventory document – you will not be able to process material movements until the difference is posted?

15. For invoice verification, a default tax code can be set up per company code?

16. When creating Contracts – a Purchase Organization must be specified?

17. One step Transfer postings can done between plants if the plants belong to different company codes?

18. In external service management a service entry sheet is the same as a goods receipt?

19. If the “Source List” selection is set in the material master then you must maintain a source list for the material?

20. If the “Quota Arrangement” option is set in a material master then you must maintain a quota arrangement for the material?

21. For valuation, a plant is assigned a chart of accounts?

22. For a Framework requisition (type FO) the validity dates are entered on header level?

23. MRP Area is a grouping of PLANTS?

24. MRP can create reservations?

25. Exchange rates can be changed during invoice verification (ref to PO) but it must be done before the PO number is typed in?

26. Manual postings to stock (GL) accounts can only be made if the current stock quantity is zero?

27. A material type can be configured to “allow pipeline” or “pipeline mandatory”?

28. Goods receipt to “GR block stock” for valuated material will create a material document?

29. Only one plant / storage location can be used in one Physical Inventory document?

30. Consignment info records can only be created in the currency of the company?

31. The same material (for a specific plant) can be set up for either batch management or split valuation – not both?

32. For MRP to create stock transport requisitions (PR with item category U) a source list must be set up?

33. When creating a Purchase Requisition for a material the price in the PR is from the material master?

34. Source lists can be created for a material group?

35. Planned delivery costs is specified in pricing conditions and can not be changed during invoicing?

36. Field selection can be linked to release indicator (status)?

37. Returnable transport packaging stocks are never valued?

38. Consignment stock can be receipted in block stock?

39. Stock can only go negative if the material is valued as standard price, not moving average price?

40. Reservations that are flagged for deletion can be un-deleted by simply removing the flag?

41. Purchase requisitions that are flagged for deletion can be un-deleted by simply removing the flag?

42. Requirements date on a reservation is specified on header level?

43. If the “Shelf live expiration date” (SLED) is set in the material master but not in the Purchase Order then it will not be checked during Goods Receipt?

44. End User training takes place during the “Go-Live and Support” phase of a project?

45. SAP Solution Manager provides the methodology through 3 roadmaps – Implementation, Solution Management & Global?

46. A Parked invoice is visible in the PO History?

47. A “Hold document” (invoice) is only visible in PO History if the balance is zero?

48. Automatic Invoice reduction can take place if the vendor specific tolerance is set up. Invoice reduction can only take place for positive differences and not for negative diverences?

49. Subsequent debit / credit will not post to GR/IR account?

50. Unplanned delivery costs will always post either to stock or consumption account?

51. The duplicate invoice check is activated on company code level?

52. Account assignment U can be used in PR and contract but not in Purchase Orders?

53. The same Valuation Grouping code can be linked to multiple plants belonging to different company codes?

54. Configuration takes place during the realization phase?

55. The project definition activity takes place in “Blueprint” phase?

56. For missing parts check to function, the availability checking must be activated for a material?

57. A message schema contains message types?

58. A Quote can be accepted or rejected?

59. In the material type configuration a setting is available to indicate if the material can be managed as consignment stock?

60. Reservations from production are called manual reservations?

Answers

1. FALSE – only on header

2. TRUE –Although the overall PO is only in one currency (specified on header) – individual items can have prices in different currencies.

3. FALSE — Factory calendar is link to Plant

4. FALSE – It is set for the system

5. TRUE

6. FALSE – it can be both

7. FALSE – on MRP type

8. TRUE

9. FALSE – only in a PO

10. TRUE

11. TRUE — only other stock types can be included/excluded, such as Block stock, QI stock, safety stock, ….

12. FALSE – per plant

13. TRUE

14. FALSE – until the count is entered (not posted)

15. TRUE

16. TRUE (on header level)

17. TRUE – it is known as a inter company transfer

18. TRUE – service entry sheet + acceptance is the same as goods receipt (movement type 101)

19. TRUE

20. FALSE – for quota arrangements the tick on material master only activates the functionality but the use is optional

21. FALSE – the chart of accounts is linked to the company code

22. FALSE – there is a FO type for purchase requisitions but no place to enter validity period. It is normally entered as free text in one of the long text fields

23. FALSE – grouping of Plant + Storage Location

24. FALSE – only planned orders, PR and delivery schedules

25. TRUE

26. FALSE – no manual postings can be made to stock accounts

27. TRUE

28. TRUE – but not an accounting document

29. TRUE – data is on header level

30. FALSE

31. TRUE

32. TRUE – to specify the supplying plant

33. TRUE –

34. FALSE – for a material (for a specific plant)

35. FALSE – it is conditions but it can be changed during invoicing (if variances are allowed)

36. TRUE – to indicate what fields in the document is display / mandatory / etc..

37. TRUE – only managed on quatity

38. TRUE – all the normal stock types are valid for consignment stock (QI, unrestricted , QI)

39. FALSE –moving average or standard

40. FALSE – flagged for deletion can not be reversed

41. TRUE

42. FALSE – item level. The Base date is on header level

43. FALSE – it can EITHER be set in PO or material master

44. FALSE – according to ASAP it takes place in the “Final Preparation” phase

45. TRUE –

46. TRUE

47. FALSE – hold invoice not visible in PO history

48. TRUE

49. FALSE — answer corrected by suu
Quote:
If the quantity of the subsequent debit/credit is larger than the quantity delivered, the system distributes the relevant amount proportionally. The part of the subsequent debit/credit that does not have a goods receipt is posted to the GR/IR clearing account. The remaining amount is posted to the stock account – or in the case of standard price control or insufficient stock coverage – to a price difference account.
50. FALSE – in config it can be set up to post to another GL account

51. FASLE – indicator in vendor master

52. FALSE – it can be used in some PO’s example: blanket PO, services (item cat D)

53. TRUE

54. TRUE

55. FASLE – “Project Preparation”

56. TRUE – it makes use of availability checking

57. TRUE (Used to print documents)

58. FALSE – only rejected (rejection indicator)

59. FALSE –

60. FALSE – manual reservation are those being created from MM

Ref: http://www.sap123.com/

[@more@]

http://williamzhou.itpub.net/

http://www.cnblogs.com/samuelhou/articles/1164974.html

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/93029/viewspace-1014397/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/93029/viewspace-1014397/

【SCI一区复现】基于配电网韧性提升的应急移动电源预配置和动态调度(下)—MPS动态调度(Matlab代码实现)内容概要:本文档围绕“基于配电网韧性提升的应急移动电源预配置和动态调度”主题,重点介绍MPS(Mobile Power Sources)动态调度的Matlab代码实现,是SCI一区论文复现的技术资料。内容涵盖在灾害或故障等极端场景下,如何通过优化算法对应急移动电源进行科学调度,以提升配电网在突发事件中的恢复能力与供电可靠性。文档强调采用先进的智能优化算法进行建模求解,并结合IEEE标准测试系统(如IEEE33节点)进行仿真验证,具有较强的学术前沿性和工程应用价值。; 适合人群:具备电力系统基础知识和Matlab编程能力,从事电力系统优化、配电网韧性、应急电源调度等相关领域研究的研究生、科研人员及工程技术人员。; 使用场景及目标:①用于复现高水平期刊(SCI一区、IEEE顶刊)中关于配电网韧性与移动电源调度的研究成果;②支撑科研项目中的模型构建与算法开发,提升配电网在故障后的快速恢复能力;③为电力系统应急调度策略提供仿真工具与技术参考。; 阅读建议:建议结合前篇“MPS预配置”内容系统学习,重点关注动态调度模型的数学建模、目标函数设计与Matlab代码实现细节,建议配合YALMIP等优化工具包进行仿真实验,并参考文中提供的网盘资源获取完整代码与数据。
一款AI短视频生成工具,只需输入一句产品卖点或内容主题,软件便能自动生成脚本、配音、字幕和特效,并在30秒内渲染出成片。 支持批量自动剪辑,能够实现无人值守的循环生产。 一键生成产品营销与泛内容短视频,AI批量自动剪辑,高颜值跨平台桌面端工具。 AI视频生成工具是一个桌面端应用,旨在通过AI技术简化短视频的制作流程。用户可以通过简单的提示词文本+视频分镜素材,快速且自动的剪辑出高质量的产品营销和泛内容短视频。该项目集成了AI驱动的文案生成、语音合成、视频剪辑、字幕特效等功能,旨在为用户提供开箱即用的短视频制作体验。 核心功能 AI驱动:集成了最新的AI技术,提升视频制作效率和质量 文案生成:基于提示词生成高质量的短视频文案 自动剪辑:支持多种视频格式,自动化批量处理视频剪辑任务 语音合成:将生成的文案转换为自然流畅的语音 字幕特效:自动添加字幕和特效,提升视频质量 批量处理:支持批量任务,按预设自动持续合成视频 多语言支持:支持中文、英文等多种语言,满足不同用户需求 开箱即用:无需复杂配置,用户可以快速上手 持续更新:定期发布新版本,修复bug并添加新功能 安全可靠:完全本地本地化运行,确保用户数据安全 用户友好:简洁直观的用户界面,易于操作 多平台支持:支持Windows、macOS和Linux等多个操作系统
源码来自:https://pan.quark.cn/s/2bb27108fef8 **MetaTrader 5的智能交易系统(EA)**MetaTrader 5(MT5)是由MetaQuotes Software Corp公司研发的一款广受欢迎的外汇交易及金融市场分析软件。 该平台具备高级图表、技术分析工具、自动化交易(借助EA,即Expert Advisor)以及算法交易等多项功能,使交易参与者能够高效且智能化地开展市场活动。 **抛物线SAR(Parabolic SAR)技术指标**抛物线SAR(Stop and Reverse)是由技术分析专家Wells Wilder所设计的一种趋势追踪工具,其目的在于识别价格走势的变动并设定止损及止盈界限。 SAR值的计算依赖于当前价格与前一个周期的SAR数值,随着价格的上扬或下滑,SAR会以一定的加速系数逐渐靠近价格轨迹,一旦价格走势发生逆转,SAR也会迅速调整方向,从而发出交易提示。 **Parabolic SAR EA的操作原理**在MetaTrader 5环境中,Parabolic SAR EA借助内嵌的iSAR工具来执行交易决策。 iSAR工具通过计算得出的SAR位置,辅助EA判断入市与离市时机。 当市场价位触及SAR点时,EA将产生开仓指令,倘若价格持续朝同一方向变动,SAR将同步移动,形成动态止损与止盈参考点。 当价格反向突破SAR时,EA会结束当前仓位并可能建立反向仓位。 **智能交易系统(EA)的优越性**1. **自动化交易**:EA能够持续监控市场,依据既定策略自动完成买卖操作,减少人为情感对交易的影响。 2. **精确操作**:EA依照预设规则操作,无任何迟疑,从而提升交易成效。 3. **风险管控**:借助SA...
评论
成就一亿技术人!
拼手气红包6.0元
还能输入1000个字符  | 博主筛选后可见
 
红包 添加红包
表情包 插入表情
 条评论被折叠 查看
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值