BPEL Project Sync Up Calls
Last modified on December 11th, 2006
The next sync up call will be on January 5th, 2007 @ 18-19 CET or 18-19GMT or 9-10 PST or 12-1 EST.
US/Canada | 1-888-967-2253 |
Asia Pacific | 1800 222 712 (Australia toll-free) 800 9491 2777 61 2 8817 6100 |
EMEA region | 44 118 924 9000 |
Meeting ID: | 288052 |
Password: | 2468642 |
Dec 15,2006 - BPEL Project, call summary
- ❑ BPEL Call, December 15th, 2006
- ❑ People Present
- ❑ Michal, Bruno, Simon
- ❑ Status
- ❑ Michal: Property sheets issue, resize
- ❑ Attended website school
- ❑ Worked some on the XPath editor and Validation, but not much too report.
- ❑ Simon: forEach support in editor, message exchange added.
- ❑ forEach support
- ❑ message exchange added.
- ❑ more support on the way.
- ❑ need to remove switch/case, add if-else.
- ❑ Clean up categories for new project and new file wizard.
- ❑ Bruno:
- ❑ Not much to report.
- ❑ In January release active 3.0 runtime.
- ❑ PDD generation for more tomcat versions.
- ❑
- ❑ Michal: Property sheets issue, resize
- ❑ M2 Release
- ❑ ToDo Next:
- ❑ Remove fn.xml dependencies Collaxa.
- ❑ Release 0.0.2 (M2)
- ❑ Push BPEL 2.0 compliance till M3.
- ❑
Dec 1,2006 - BPEL Project, call notes
Topic | Who |
---|---|
❑ Meeting attendees | |
❑ Bruno, Michal, Simon | |
❑ Topic | |
❑ Status | |
❑ Simon | |
❑ ForEach , perhaps for Dec 15 | |
❑ Right now redoing the EMF model to full 2.0 | |
❑ Bruno | |
❑ Active BPEL 3.0 | |
❑ Michal | |
❑ XPath editor. | |
❑ Issues | |
❑ No version numbers on dependent plugins. | |
❑ Minor bug on new project/new file wizard. | |
❑ Next Steps | |
❑ Shoot Dec 15 M2* Build (include 2.0 changes). | |
❑ December 24, final. | |
❑ Summarize web site configuration for local editing. | Michal |
❑ December 7, eclipse status reporting call (Michal). | Michal |
❑ Next Dec 15, same time, same place. |
Nov 10,2006 - BPEL Project, call summary
- People on the call.
- Simon Mosner (IBM)
- Bruno Wassermen (Univ.of.London)
- Kable (Attachmate)
- Michal Chmielewski (Oracle)
- Rodrigo Peretti (IBM)
- Update of progress
- Bruno Wasserman 0.0.2 Runtime, framework, select and deploy modules, active BPEL, but it looks like there is some magic to deploy to Active BPEL 2.1
- Simon Mosner, not much work on open source, Busy.
- Michal, XPath editor (90%), Validation (in flight).
- M2 release
- When XPath editor is done, we could call it M2. Prompters are done, XPath editor is done.
- Resource Commitments
- IBM
- Simon + 2 people.
- Oracle
- Michal + 1 people.
- OMII, Univ of London
- Bruno
- IBM
- JBOSS or Sybase
- Nothing much happening there.
- Attachmate
- Kable indicated that there is interest, might be able to contribute resources.
- Mentor - we had no idea we had one ...
- John Duminovich, will send e-mail with status and update (Michal)
- Work distribution, asking for help.
- IBM said that they were interested in getting other people involved beyond the original players. Will proceed with interest from Stutgard University.
- Next Action
- 2.0 spec activities. (?)
- Stutgard University phd students involvement (Bruno)
- Finish 2.0 spec compliance on the editor, model, UI (?)
- JBOSS might have a 2.0 engine, Active 3.0 might have one too, those would be key to provide integration points.
- Missing forEach activity in 2.0, Simon has agreed to contribute in 2 weeks or so.
- 2.0 model work might be done by interested parties in Vienna.
- XPath editor by end Nov (Oracle)
- forEach by end of Nov (IBM)
- Model work by Univ. of Vienna Ph.D students (Bruno)
- Update the website with progress and call details (Michal)
- Friday Dec 1, next call, Same call in numbers, same time.
--------------------------------------------------------------------------------------------------------------------------------------------------
之前作了很多工作,使其部署到ActiveBPEL 3.0的引擎上。但是Eclispe Designer 还是有很多不符合WS-BPEL2.0的标准,终于看见要remove swirch/case add if/else了。