ISE 530 Optimization Methods for Analytics Final Haskell

Java Python ISE 530 Optimization Methods for Analytics

Final examination

Question 1

Each hour from 10AM to 7PM, Bank of America receives checks and must process them. Its goal is to process all the checks the same day they are received.  The bank has 13 check-processing machines, each of which can process up to 500 checks per hour.   It takes one worker to operate each machine.  The bank hires both full-time and part-time workers. Full -time workers work 10AM-6PM, 11AM-7PM or Noon-8PM shifts and are paid $200 per day.  Part-time workers work either 2PM-7PM or 3PM-8PM shifts and are paid $95 per day.  The number of checks received each day is given in the table below. In the interest of maintaining continuity, the bank must have at least three

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值