How to create production order

本文档详细介绍了生产订单的创建(co01)、显示(co03)和变更(co02)过程。在创建订单时,需输入物料、工厂、订单类型等信息,并确认总量和日期。变更订单时,点击标记的红色按钮即可完成。此外,可以在AUFK中查找主数据。

1. co01( Production order Create )

Material is my finished product. My product number is the head with DL.
在这里插入图片描述Material and plant and order type are input .
在这里插入图片描述
When you input them as bellow screen. please input enter and input total and date. At last you save it .

在这里插入图片描述
Please click yes .
在这里插入图片描述
在这里插入图片描述

2. co03 (production order Display )

在这里插入图片描述 在这里插入图片描述

3. co02 (Production order Change )

When you click button with marked red. we finish the order.

在这里插入图片描述
Bellow the screenshot We can produce the order.
在这里插入图片描述

4. Position

I will look for master data in the AUFK

Process Instruction (PI) Sheet:          Sheets to exchange data between the partially or completely manually operated production level Features of PI sheet          PI sheet can display Control information such as instructions for the Process operator in the Shop-floor on how to carryout the production step in effective manner          Critical Machine parameters like Operating temperature, Die & Mould settings  which are not captured in any form in SAP can be recorded with the help of PI Sheet Sequential steps:          Creation of PI sheet/Control recipe destination          Creation of Process Message category          Creation of  Process Instruction Category          Assigning Process message & Process Instruction Category to the Phase of the Master recipe –C202          Generating Control Recipe-COR2          Sent Control Recipe-CO53XT          PI sheet details entry-CO60XT   Steps in details:   Step 1 Creation of PI sheet/Control recipe destination Step 2 Creation of Process Message Category Step 3 Creation of Process Instruction Category Step 4 Assigning Process message & Process Instruction Category to the Phase of the Master recipe   Go to C202-Change Master recipe Enter the Material code/Recipe group to which the assignment needed Select the phase and click   Enter the Process Instructions, Process Instructions category as follows and click any one Process instructions category Enter the required Characteristic and the characteristic value as follows, Save the recipe group Step 5  Generating control recipe-COR2: Go to T. code COR2-Change Process Order Enter the Process order number Menu path for Generating Control Recipe:     Save the process order Click here to continue..
05-16
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值