Five signs you’re not agile; you’re actually mini-waterfall
http://watirmelon.com/2013/12/11/five-signs-youre-not-agile-youre-actually-mini-waterfall/
I’ve noticed a lot of projects call themselves agile when in fact they’re mini-waterfall, also known as scrumfall. Here’s five warning signs that you’ll see if you fall into that category:
- Development for your user stories seems to take almost all of the iteration and only move to ‘ready for test’ during the afternoon of the last day of your iteration
- You have a whole lot of user stories that are waiting business ‘signoff’ and can’t be worked on
- You have a large chunk of time set aside at the end of the project for ‘user acceptance testing’
- Team members live in fear of changing something or moving a story card around something as they’re scared of being ‘told off’
- You develop in iterations but only release everything big bang at the end when everything is considered ‘done’

本文列举了五个迹象表明团队可能并未真正实现敏捷开发,而是在进行所谓的“迷你瀑布”式开发。这些迹象包括:用户故事几乎占据整个迭代周期、大量用户故事等待业务确认、项目末期预留大量用户验收测试时间、团队成员害怕改变及迭代开发但最终一次性发布。