   I will go on the unfinished project last week in this week.  The schedule will re-adjusted.  As a matter of fact, the project
developing schedule have to be re-adjusted when met an important problem.  During developing, there are many an unexpected cases.
So, a good project manager should put aside the enough time to solve those unexpected situations when computing out the whole project
developing schedule.

  How long time ought to be as for reserve time?  There is not a formula that can be used precisely.  Usually, in our group, we
adopt the last of the coding time as the reserve time.  The coding means begining to implement a program.  At that phase, with
exception of implement, checking wether a design can be implemented is also went on at once.  So, it is an important phase in developing
period.

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值