  Today I have to finish the part design as for the comparing thread.  There is another the manager thread is waiting for me.
The original plan is to finish the whole design in this week.  The next step is to write the system testing report.

  There is only half and one month.  I felt that the time is not enough to develop the system.  There are still many a pending
question.  In the system design report from Japan here is still many a scarcity.  I should have lengthened the design phase.
However, the whole developing period is too short to deal with enough time for each phase.